Difference between revisions of "Electronics Corridor"
Jump to navigation
Jump to search
(4 intermediate revisions by 2 users not shown) | |||
Line 7: | Line 7: | ||
|use=Internal access to [[Downstairs]] | |use=Internal access to [[Downstairs]] | ||
|floor=Downstairs | |floor=Downstairs | ||
− | |floorplanimage=File:Floorplan - | + | |floorplanimage=File:Floorplan - CNC Corridor.png |
}} | }} | ||
The internal entrance to [[downstairs]] is via the '''CNC Corridor''', it leads directly to the [[CNC Area]] and [[Team Storage]]. | The internal entrance to [[downstairs]] is via the '''CNC Corridor''', it leads directly to the [[CNC Area]] and [[Team Storage]]. | ||
+ | |||
+ | ==Light Control== | ||
+ | [[File:CNC Corridor Switch.jpeg|250px]] | ||
+ | [[File:CNC Corridor Switch Context.jpeg|250px]] | ||
{{Location List}} | {{Location List}} |
Revision as of 00:46, 11 April 2021
This page is a stub. You can help by expanding it! This page is included in the list of stub pages. |
Please improve this page by adding a photo. Click to upload an image, help with using images can be found here. The talk page may contain suggestions about suitable images. |
Electronics Corridor | |
---|---|
Intended Use | Internal access to Downstairs |
Team | Infrastructure |
Floor | Downstairs |
Map | |
Locations: all pages {{}} |
The internal entrance to downstairs is via the CNC Corridor, it leads directly to the CNC Area and Team Storage.
Light Control
Locations | |
---|---|
Upstairs | Comfy Area • Studio • Members Storage • Textiles Workshop • Kitchen • Toilets • Workshop • Dusty Area • Metalworking Area • Spray Booth • Laser Area • CNC Area • Screen Printing |
Downstairs | 3D Printer Area • Electronics Area • Blue Room • Team Storage • Metalworking Downstairs • Members Storage Downstairs • Classroom • Bike Area • Main Corridor • CNC Corridor |