The [[Electronics Area]] received a tidy up, a component sort & a new table!
 
The [[Electronics Area]] received a tidy up, a component sort & a new table!
  
===Painting Doors===
+
<gallery mode=packed-hover heights=250px>
 +
File:Hack The Space Nov19 - Electronics Table.jpg
 +
</gallery>
 +
 
 +
===Painting===
 
The doors in the [[Studio]] were looking tired so we decided to sand them, prime them and pain them hackspace green! The door frames were also repainted gloss white.  
 
The doors in the [[Studio]] were looking tired so we decided to sand them, prime them and pain them hackspace green! The door frames were also repainted gloss white.  
  
Line 22: Line 26:
 
File:Hack The Space Nov19 - Doors (2).jpg
 
File:Hack The Space Nov19 - Doors (2).jpg
 
File:Hack The Space Nov19 - Doors (1).jpg
 
File:Hack The Space Nov19 - Doors (1).jpg
 +
File:Hack The Space Nov19 - Doors.jpg
 
</gallery>
 
</gallery>
 +
 +
 +
In the [[Workshop]] the party wall shared with the studio was painted.
 +
<gallery mode=packed-hover heights=250px>
 +
File:Hack The Space Nov19 - Paint.jpg
 +
File:Hack The Space Nov19 - Paint (2).jpg
 +
</gallery>
 +
 
===Cleaning the Kitchen===
 
===Cleaning the Kitchen===
 
Bins in the [[Kitchen]] were starting to develop sentient bacteria so we emptied everything, bleached everything and swept around them.  
 
Bins in the [[Kitchen]] were starting to develop sentient bacteria so we emptied everything, bleached everything and swept around them.  
Line 38: Line 51:
 
File:Hack The Space Nov19 - Kitchen (1).jpg
 
File:Hack The Space Nov19 - Kitchen (1).jpg
 
</gallery>
 
</gallery>
 +
 
===Servicing the Vinyl Flooring===
 
===Servicing the Vinyl Flooring===
 
The vinyl foor in the [[Studio]] that was laid on the last Hack the space weekend had lots of bulges where the floor had settled and risen up. Each seam between the rolls was cut, trimmed and reglued to remove the bulges.  
 
The vinyl foor in the [[Studio]] that was laid on the last Hack the space weekend had lots of bulges where the floor had settled and risen up. Each seam between the rolls was cut, trimmed and reglued to remove the bulges.  
Line 45: Line 59:
  
 
===Painting the Spraybooth===
 
===Painting the Spraybooth===
The [[Spray Booth]] had years of caked up paint solidified inside it. We chipped away the old paint and took the room back to a white finish. The filters were checked and replaced. A hole was patched in the wall.  
+
The [[Spray Booth]] had years of caked up paint solidified inside it. We chipped away the old paint and took the room back to a white finish. The filters were checked and replaced. A hole was patched in the wall.
  
 +
<gallery mode=packed-hover heights=250px>
 +
File:Hack The Space Nov19 - Spray Booth.jpg
 +
</gallery>
  
 
===Rearranging Metalworking Area===
 
===Rearranging Metalworking Area===
The [[Metalworking Area]] was rejigged. The band saw moved to be near the [[Dusty Area]] partition wall. The mini mill and mini lathe were moved away from the wall of the building and the floor was repainted red.  
+
The [[Metalworking Area]] was rejigged. The band saw moved to be near the [[Dusty Area]] partition wall. The mini mill and mini lathe were moved away from the wall of the building and the floor was repainted red.
  
 +
<gallery mode=packed-hover heights=250px>
 +
File:Hack The Space Nov19 - Metalworking Area (2).jpg
 +
File:Hack The Space Nov19 - Metalworking Area (1).jpg
 +
</gallery>
  
 
===Fitting the new Water Heater===
 
===Fitting the new Water Heater===
Line 56: Line 77:
 
It is a [https://www.amazon.co.uk/gp/product/B00EUZ653M/ Triton T30i 3kW].
 
It is a [https://www.amazon.co.uk/gp/product/B00EUZ653M/ Triton T30i 3kW].
  
 +
<gallery mode=packed-hover heights=250px>
 +
File:Hack The Space Nov19 - Water Heater.jpg
 +
</gallery>
  
 
===Progress pictures===
 
===Progress pictures===
 
<gallery mode=packed-hover heights=250px>
 
<gallery mode=packed-hover heights=250px>
File:Hack The Space Nov19 - Water Heater.jpg
 
 
File:Hack The Space Nov19 - Task List.jpg
 
File:Hack The Space Nov19 - Task List.jpg
File:Hack The Space Nov19 - Spray Booth.jpg
 
 
File:Hack The Space Nov19 - Pizza.jpg
 
File:Hack The Space Nov19 - Pizza.jpg
File:Hack The Space Nov19 - Paint.jpg
 
File:Hack The Space Nov19 - Paint (2).jpg
 
File:Hack The Space Nov19 - Metalworking Area (2).jpg
 
File:Hack The Space Nov19 - Metalworking Area (1).jpg
 
 
File:Hack The Space Nov19 - Electronics Table.jpg
 
File:Hack The Space Nov19 - Doors.jpg
 
 
 
</gallery>
 
</gallery>
  
Line 79: Line 93:
  
 
<!-- When deploying remove Wiki boilerplate category, and add Category:Event -->   
 
<!-- When deploying remove Wiki boilerplate category, and add Category:Event -->   
[[Category:Events]]
+
[[Category:Events (past)]]
[[Category:Looking for Collaborators]]
 

Latest revision as of 11:32, 23 November 2019

There was a Hack the Space Days weekend from Saturday 16th (10.30am) to Sunday 17th (7pm) November. It was all hands on deck improving our space!

Many thanks to the 50 or so people who gave up some of their time to make this a success.

Major Tasks

Refurbishing Electronics Area

The Electronics Area received a tidy up, a component sort & a new table!

Painting

The doors in the Studio were looking tired so we decided to sand them, prime them and pain them hackspace green! The door frames were also repainted gloss white.

After the paint dried we added labels cut on the Sihouette Cameo.


In the Workshop the party wall shared with the studio was painted.

Cleaning the Kitchen

Bins in the Kitchen were starting to develop sentient bacteria so we emptied everything, bleached everything and swept around them.

The oven was given a good clean out & the fridge was cleaned too.

The kitchen table was sanded back to bare wood and re-finished.

Servicing the Vinyl Flooring

The vinyl foor in the Studio that was laid on the last Hack the space weekend had lots of bulges where the floor had settled and risen up. Each seam between the rolls was cut, trimmed and reglued to remove the bulges.

After the bulges were taken out, the floor was hot mopped.


Painting the Spraybooth

The Spray Booth had years of caked up paint solidified inside it. We chipped away the old paint and took the room back to a white finish. The filters were checked and replaced. A hole was patched in the wall.

Rearranging Metalworking Area

The Metalworking Area was rejigged. The band saw moved to be near the Dusty Area partition wall. The mini mill and mini lathe were moved away from the wall of the building and the floor was repainted red.

Fitting the new Water Heater

We bought and fitted a new water heater to replace the leaking one in the bathroom. The new one was plumbed in and now doesn't leak! It is a Triton T30i 3kW.

Progress pictures

Resources