Difference between revisions of "Hack the Space Days/8th-10th Feb 2019"

From Nottinghack Wiki
Jump to navigation Jump to search
m (→‎Studio Flooring Replacement: craft status update)
 
(30 intermediate revisions by 5 users not shown)
Line 1: Line 1:
==Intro==
+
We held a Hack the Space weekend from 18:00 on Friday 8th February to 18:00 Sunday 10th February (some jobs starting at 13:00). It was all hands on deck improving our space! This wiki page was intended to detail exactly what needed doing so that we were all working towards the same goals. Now that the weekend is over, this page shows what we were working on and our progress.
We will be holding a Hack the Space weekend from 18:00 on Friday 8th February till 18:00 Sunday 10th February (some jobs starting at 13:00). '''During this time no normal project work will be happening.''' It'll be all hands on deck improving our space!  
+
 
 +
Many thanks to the many people who gave their time to make this a success.
  
Our Hackspace is only as great as our members make it so please join us. Regardless of if you can only spend 30 minutes or the whole weekend at the space; during this time any, and all, help will be greatly appreciated.
 
  
This wiki page is interactive and is intended to detail exactly what needs doing so that we're all working towards the same goals. If you know of anything that needs fixing or looking at, feel free to add it to the list! In theory, someone could turn up at 3 am and complete some jobs off this list without anyone there to tell them what to do. You will see the page gradually change on the run-up to the weekend as more teams & members populate it.
 
  
 
== Studio Flooring Replacement ==
 
== Studio Flooring Replacement ==
  
As many are aware the studio flooring is in desperate need of replacement after many years of surviving. I think for 2019 it is time for new flooring. During this time we will also be resetting LPS (Large Project Storage). Below are some of the jobs if you are interested in helping out
+
As many are aware the studio flooring was in desperate need of replacement after many years of surviving. 2019 was time for new flooring. During this time we also reset LPS (Large Project Storage). Below are some of the jobs completed
  
 
{| class="wikitable"
 
{| class="wikitable"
Line 22: Line 21:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Ongoing
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Ongoing
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | N/A
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | N/A
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Spacebee|Hairy Paul]]
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
|-
 
|-
Line 32: Line 31:
 
Session 2: 15/01/19 7pm.
 
Session 2: 15/01/19 7pm.
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri (daytime)
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri (daytime)
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Spacebee|Hairy Paul]], [[User:bobw|bobw]], [[User:danspencer101|danspencer101]], HS2.5 Task force, anyone else?
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 +
[[User:Spacebee|Hairy Paul]], [[User:bobw|bobw]],  
 +
 
 +
[[User:danspencer101|danspencer101]], HS2.5 Task force
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
Session 1: Carpet removed, Vinyl Cut.  
 
Session 1: Carpet removed, Vinyl Cut.  
Line 40: Line 42:
 
{{done|date=15/01/19}}
 
{{done|date=15/01/19}}
 
|-
 
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Sewing Machines and Embrodery Machine
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Sewing Machines and Embroidery Machine
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Spacebee|Hairy Paul]]
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | The machines are now in the new craft room  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | The machines are now in the new craft room  
  
Line 52: Line 54:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/2019}}
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines
Line 58: Line 60:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Daniel|Daniel]]
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Daniel|Daniel]]
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/2019}}
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Remove Bench to workshop
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Remove Bench to workshop
Line 64: Line 66:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/2019}}
 
|-
 
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Removal of Workshop Floor
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Removal of Studio Floor
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri / Sat (Morn)
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri / Sat (Morn)
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat (AM)
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat (AM)
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/2019}}
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Prep floor for new flooring
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Prep floor for new flooring
Line 77: Line 79:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 +
*Nails were hammered down.
 +
*Worst parts of the Floor were filled in with new bits of wood.
 +
*Stickiest parts of the floor had glue removed.
 +
 +
{{done|date=08/02/2019}}
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Lay new flooring
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Lay new flooring
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat / Sun
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat / Sun
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  {{done|date=09/02/2019}}
 +
|-
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" | refix the door bars & make good.
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sun
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
Line 88: Line 101:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}}
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines back
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines back
Line 94: Line 107:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}}
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Tidy and Drinks
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Tidy and Drinks
Line 100: Line 113:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}}
 
|}
 
|}
 +
 +
===Progress Pictures===
 +
<gallery mode=packed-hover heights=250px>
 +
File:HTSD 8th Feb 2019 - Studio Floor Removed.jpg|Old Studio Floor Removed
 +
File:HTSD 8th Feb 2019 - Studio Floor Prepping.jpg|Prepping the Studio Floor
 +
File:HTSD 8th Feb 2019 - Laying out Hardboard.jpg|Laying out Hardboard
 +
File:HTSD 8th Feb 2019 - Laying Vinyl.jpg|Laying Vinyl
 +
File:HTSD 8th Feb 2019 - Finished Studio Floor.jpeg|Finished Vinyl Floor
 +
</gallery>
  
 
==Clearing the Large Project Storage Area==
 
==Clearing the Large Project Storage Area==
 
+
[[File:HTSD 8th Feb 2019 - LPS Cleared.jpeg|200px|right|thumb|Large Project Storage used to be here!]]
 
{| class="wikitable"
 
{| class="wikitable"
! colspan="5" style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Studio Floor Replacement
+
! colspan="5" style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Large Project Storage
 
|-
 
|-
 
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Job
 
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Job
Line 113: Line 135:
 
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Volunteers
 
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Volunteers
 
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Completed?
 
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Completed?
 +
|-
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Give notice of intentions to Hackspace members
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" | 03/01/2019
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" | -
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie
 +
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [https://groups.google.com/d/msg/nottinghack/NNtj3JX-9iI/8EKMJA5_DwAJ This] was sent out in addition to Posters put up in the space
 +
 +
{{done|date=03/01/19}}
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Empty the main shelves, auditing projects as we go
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Empty the main shelves, auditing projects as we go
Line 118: Line 148:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/19}}
 
|-
 
|-
 
|-
 
|-
Line 125: Line 155:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Clear all corners and under tables of abandoned crap
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Clear all corners and under tables of abandoned crap
Line 131: Line 161:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/19}}
 
|-
 
|-
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move all abandoned projects into the closed off area of 2.5
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move all abandoned projects into the closed off area of 2.5
Line 137: Line 167:
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
 
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
+
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/19}}
 
|}
 
|}
  
==CNC Area==
+
The [[Large Project Storage]] has been cleared!
===Dust shoe for CNC Mill===
+
 
 +
Thank you to all volunteers :)
  
This is a low priority task that could be worked on if alone in the space during the shutdown.  
+
"Active" projects have been moved to sheet storage over the weekend.
It will probably require some 3D Modelling skill.
+
All others have been moved to downstairs for a month.
 +
{{clear}}
  
The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover.
+
==PAT Testing==
Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html
+
{{also|Team:Safety/Portable_appliance_testing}}
 +
Portable appliance testing needs to be carried out to bring us in line with safety regulations. This job started on Saturday. It is simple to do and needs no special skills beyond being able to properly use and read the test equipment. Demonstrations were available from James Adams or [[User:Layjet|James Taylor]] of [[Team:Safety|Safety Team]] and [[Trustees|Trustee]] fame.
  
===Tool Storage Rack===
+
Portable Appliance Testing Records (credit [[User:Alexmann|Alex Mann]])
See: [[Project:CNC Tool Storage]]
+
http://nhpat.ocatelle.xyz/login/
  
[[File:HTSD - Loose CNC tools needing a rack.jpeg|150px|thumbnail|right|Loose tools sitting on the stepper controller]]
+
Contact: Team: Safety ([[Slack]]) - James Taylor
  
The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future.
+
===See also===
 +
* [http://www.hse.gov.uk/electricity/faq-portable-appliance-testing.htm PAT - Portable appliance testing FAQs (Health and Safety Executive)]
  
Don't think any modelling skills will be required for this as there are lots of different solutions that could work.
+
===Progress===
 +
Many thanks to all those who participated in the PAT testing. Lots of appliances were tested and added to the relevant databases.
  
 
==Miscellaneous Jobs==
 
==Miscellaneous Jobs==
*Reorganise comfy area including rewiring of speakers
+
===Fire Escape Signage===
*Electrics within the workshop (replacing lights) etc
+
New fire escape signage has been hung around the hackspace.
*2.5 jobs TBC
+
 
 +
{{done|date=10/02/2019}}
 +
 
 +
===Electrics within the workshop===
 +
Workshop lights were replaced
 +
 
 +
{{done|date=10/02/2019}}
 +
 
 +
===Washing the Lab Coats===
 +
Lab coats and overalls were taken home and given a good wash.  
 +
Sparkly white now & fit for human habitation.
 +
 
 +
<gallery>
 +
File:HTSD 10th Feb 2019 - Washing Labcoats.jpeg|Filthy Labcoats
 +
File:HTSD 10th Feb 2019 - Clean Labcoats.jpeg|Clean Labcoats
 +
</gallery>
 +
 
 +
{{done|date=10/02/2019}}
  
 
===Move the Piano===
 
===Move the Piano===
 +
The [[Piano]] was moved into the comfy area. The radiogram has not been moved.
  
There has been some talk on slack about moving the [[Piano]] into the comfy area. One plan is to make space in the comfy area by re-homing or removing the radiogram.
+
{{done|date=10/02/2019}}
  
 
===Broken Toilet Seat===
 
===Broken Toilet Seat===
[[File:HTSD - Broken toilet seat.jpeg|100px|thumbnail|right|Broken lid]]
+
[[File:HTSD - Broken toilet seat.jpeg|150px|thumbnail|right|Broken lid]]
  
One of the toilet seats is broken and could do with being replaced. Its the cubicle furthest from the door to the bathroom.
+
One of the toilet seats was broken.
On closer inspection the seat isn't broken but the lid is. Could use replacement or removing the lid just to tidy it up a bit.
 
  
Noticed on 24/1/19 that this has been completed by some anonymous kind soul {{done}}
+
There is a new shiny lid on the toilet now as this has been completed by some anonymous kind soul  
  
===Producing a Checklist of tools and PAT testing===
+
{{done|date=24/01/19}}
Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend. There is already a wiki page for this list that can be updated by anyone :)
+
{{clear}}
  
The wiki page for the list is located here: [[Tools/We_Have|Tool list]]
+
===Leaking Tap===
 +
The hot tap in the upstairs toilet is leaking. This could do with being looked at before it gets any worse by someone with plumbing skills.
  
===Leaking Tap===
 
Noticed that the hot tap in the toilet is leaking. This could do with being looked at before it gets any worse by someone with plumbing skills
 
 
See Video:
 
See Video:
  
 
{{#widget:YouTube|id=qjY11-KQwho}}
 
{{#widget:YouTube|id=qjY11-KQwho}}
  
[[Category:Events]]
+
===Producing a Checklist of tools===
 +
 
 +
Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend, (see also Portable Appliance Testing Records at http://nhpat.ocatelle.xyz/login/). There is already a wiki page for this list that can be updated by anyone :)
 +
 
 +
The wiki page for the list is located here: [[Tools/We_Have|Tool list]]
 +
 
 +
==CNC Area==
 +
[[File:HTSD - Loose CNC tools needing a rack.jpeg|150px|thumbnail|right|Loose tools sitting on the stepper controller]]
 +
===Dust shoe for CNC Mill===
 +
 
 +
This is a low priority task that could be worked on if alone in the space during the shutdown.
 +
It will probably require some 3D Modelling skill.
 +
 
 +
The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover.
 +
Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html
 +
 
 +
===Tool Storage Rack===
 +
See: [[Project:CNC Tool Storage]]
 +
 
 +
The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future.
 +
{{clear}}
 +
[[Category:Events (past)]]

Latest revision as of 18:45, 8 May 2019

We held a Hack the Space weekend from 18:00 on Friday 8th February to 18:00 Sunday 10th February (some jobs starting at 13:00). It was all hands on deck improving our space! This wiki page was intended to detail exactly what needed doing so that we were all working towards the same goals. Now that the weekend is over, this page shows what we were working on and our progress.

Many thanks to the many people who gave their time to make this a success.


Studio Flooring Replacement

As many are aware the studio flooring was in desperate need of replacement after many years of surviving. 2019 was time for new flooring. During this time we also reset LPS (Large Project Storage). Below are some of the jobs completed

Studio Floor Replacement
Job Day Deadline Volunteers Completed?
Empty the Craft Room Ongoing N/A Hairy Paul
Replacement of Craft Room Floor

Session 1: 09/01/19 7pm.

Session 2: 15/01/19 7pm.

Fri (daytime)

Hairy Paul, bobw,

danspencer101, HS2.5 Task force

Session 1: Carpet removed, Vinyl Cut.

Session 2: Hard Board and Vinyl Laid.

 Done (15/01/19)

Move Sewing Machines and Embroidery Machine Fri Hairy Paul The machines are now in the new craft room

 Done (29/01/19)

Move Tables & Chairs to Workshop Fri Fri  Done (08/02/2019)
Move Vending Machines Fri Fri Daniel  Done (08/02/2019)
Remove Bench to workshop Fri Fri  Done (08/02/2019)
Removal of Studio Floor Fri / Sat (Morn) Sat (AM)  Done (08/02/2019)
Prep floor for new flooring Sat Sat (PM)
  • Nails were hammered down.
  • Worst parts of the Floor were filled in with new bits of wood.
  • Stickiest parts of the floor had glue removed.

 Done (08/02/2019)

Lay new flooring Sat / Sun  Done (09/02/2019)
refix the door bars & make good. Sun
Move Tables & Chairs back to workshop Sun  Done (10/02/2019)
Move Vending Machines back Sun  Done (10/02/2019)
Tidy and Drinks Sun  Done (10/02/2019)

Progress Pictures

Clearing the Large Project Storage Area

Large Project Storage used to be here!
Large Project Storage
Job Day Deadline Volunteers Completed?
Give notice of intentions to Hackspace members 03/01/2019 - Sophie This was sent out in addition to Posters put up in the space

 Done (03/01/19)

Empty the main shelves, auditing projects as we go Friday 8th, 1pm - 8pm Friday 8th, 1pm - 8pm Sophie, Jymbob  Done (08/02/19)
Empty the temporary sheet storage, auditing projects as we go Friday 8th, 1pm - 8pm Friday 8th, 1pm - 8pm Sophie, Jymbob
Clear all corners and under tables of abandoned crap Friday 8th, 1pm - 8pm Friday 8th, 1pm - 8pm Sophie, Jymbob  Done (08/02/19)
Move all abandoned projects into the closed off area of 2.5 Friday 8th, 1pm - 8pm Friday 8th, 1pm - 8pm Sophie, Jymbob  Done (08/02/19)

The Large Project Storage has been cleared!

Thank you to all volunteers :)

"Active" projects have been moved to sheet storage over the weekend. All others have been moved to downstairs for a month.

PAT Testing

Portable appliance testing needs to be carried out to bring us in line with safety regulations. This job started on Saturday. It is simple to do and needs no special skills beyond being able to properly use and read the test equipment. Demonstrations were available from James Adams or James Taylor of Safety Team and Trustee fame.

Portable Appliance Testing Records (credit Alex Mann) http://nhpat.ocatelle.xyz/login/

Contact: Team: Safety (Slack) - James Taylor

See also

Progress

Many thanks to all those who participated in the PAT testing. Lots of appliances were tested and added to the relevant databases.

Miscellaneous Jobs

Fire Escape Signage

New fire escape signage has been hung around the hackspace.

 Done (10/02/2019)

Electrics within the workshop

Workshop lights were replaced

 Done (10/02/2019)

Washing the Lab Coats

Lab coats and overalls were taken home and given a good wash. Sparkly white now & fit for human habitation.

 Done (10/02/2019)

Move the Piano

The Piano was moved into the comfy area. The radiogram has not been moved.

 Done (10/02/2019)

Broken Toilet Seat

Broken lid

One of the toilet seats was broken.

There is a new shiny lid on the toilet now as this has been completed by some anonymous kind soul

 Done (24/01/19)

Leaking Tap

The hot tap in the upstairs toilet is leaking. This could do with being looked at before it gets any worse by someone with plumbing skills.

See Video:

Producing a Checklist of tools

Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend, (see also Portable Appliance Testing Records at http://nhpat.ocatelle.xyz/login/). There is already a wiki page for this list that can be updated by anyone :)

The wiki page for the list is located here: Tool list

CNC Area

Loose tools sitting on the stepper controller

Dust shoe for CNC Mill

This is a low priority task that could be worked on if alone in the space during the shutdown. It will probably require some 3D Modelling skill.

The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover. Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html

Tool Storage Rack

See: Project:CNC Tool Storage

The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future.