Difference between revisions of "Kitchen Revamp 2018"

From Nottinghack Wiki
Jump to navigation Jump to search
(update following refit in 2018, added context regarding current planning (there isn't any))
(project complete +image)
Line 1: Line 1:
{{photo}}
+
{{Project
{{update|reason=I will add Project Template once I have chance to grab a photo. Also, I think this is complete}}
+
|image=File:Project Kitchen Revamp.jpeg
 +
|name=Kitchen Revamp
 +
|primary=
 +
|created=23/05/2015
 +
|completeddate=27/10/2018
 +
|dormantdate=
 +
|version=
 +
|members=Various
 +
|status=Complete
 +
|type=infrastructure
 +
|livestatus=
 +
|qrmode=1
 +
}}
 +
After the [[Comfy Area]] had been revamped some members felt it was time to revamp the [[Kitchen]] a little.  
  
After the [[Comfy Area]] had been revamped some members felt it was time to revamp the [[Kitchen]] a little.
+
This project has been completed and there no further plans to upgrade the [[Kitchen]]. The floor/painting and general clear out was done in summer 2018.
==Update 2019==
+
Below is a record of plans outlined previously around 2016.
Currently, there are no active plans to upgrade The Kitchen. The floor/painting and general clear out was done in summer 2018.
 
Below is a record of plans outlined previously around 2016?
 
 
Next job is likely the cupboards some of which are sagging.
 
Next job is likely the cupboards some of which are sagging.
  

Revision as of 00:01, 28 February 2019

Kitchen Revamp
Project Kitchen Revamp.jpeg
Primary Contact
Created 23/05/2015
Completed 27/10/2018
Dormant
Version
Members Various
Manufacturer {{{manufacturer}}}
Model {{{model}}}
Location [[{{{location}}}]]
GitHub / Repo {{{repo}}}
Status Complete
Type Hackspace Infrastructure
Live Status
QR code

After the Comfy Area had been revamped some members felt it was time to revamp the Kitchen a little.

This project has been completed and there no further plans to upgrade the Kitchen. The floor/painting and general clear out was done in summer 2018. Below is a record of plans outlined previously around 2016. Next job is likely the cupboards some of which are sagging.

Electrics rework to support a new hob

The sockets currently over the kitchen counter need moving and their supply cables rearranging.
A new feed for the hob will need fitting from the distribution board
Estimated cost £50
Estimated time required 1-2 days

New kitchen hob

Chosen for it's robustness based on experience of these in rented (i.e. multi-use) residences.

ElectrIQ Ceramic 60cm Touch Control hob Vitro Glass Black
http://www.appliancesdirect.co.uk/p/eiqehceramictouch60/electriq-eiqehceramictouch60-4-zone-ceramic-hob
Cost £120
Time to install 1/2 day

Hob extractor

ElectriQ eIQCHCGBB70 70cm Curved Black Glass Cooker Hood Satin Black
http://www.appliancesdirect.co.uk/p/eiqchcgbb70/electriq-eiqchcgbb70-70cm-chimney-hood
Cost £95
Time to install 1/4 day

New floor

Replaced 2018, vinyl over harboard.

Fixing up the Oven cabinet

It should be on legs and fit nicer under the worktop.
In fact a new carcass would only cost £33 from B&Q
IT Kitchens White Melamine Oven Unit Carcass (W)600mm
http://www.diy.com/rooms/it-kitchens-white-melamine-oven-unit-carcass-w600mm/37271_BQ.prd
Time 1/4 day

New sink Tap

Boston Chrome Effect Pillar Tap
http://www.diy.com/departments/boston-chrome-effect-pillar-tap/38614_BQ.prd
Cost £23
Time 1/2 day