Difference between revisions of "Kitchen Revamp 2018"

From Nottinghack Wiki
Jump to navigation Jump to search
(floor updated)
m (Danspencer101 moved page Kitchen Revamp to Kitchen Revamp 2018: Project Completed 2018, Next revamp whenever it happens should have a new page)
 
(3 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{photo}}
+
{{Project
{{update|reason=I will add Project Template once I have chance to grab a photo. Also, I think this is complete}}
+
|image=File:Project Kitchen Revamp.jpeg
 +
|name=Kitchen Revamp
 +
|primary=
 +
|created=23/05/2015
 +
|completeddate=27/10/2018
 +
|dormantdate=
 +
|version=
 +
|members=Various
 +
|status=Complete
 +
|type=infrastructure
 +
|livestatus=
 +
|qrmode=1
 +
}}
 +
After the [[Comfy Area]] had been revamped some members felt it was time to revamp the [[Kitchen]] a little.  
  
Now the comfy area has been revamped some members feel it is time to revamp the kitchen a little
+
This project has been completed and there no further plans to upgrade the [[Kitchen]]. The floor/painting and general clear out was done in summer 2018.
 +
Below is a record of plans outlined previously around 2016.
 +
Next job is likely the cupboards some of which are sagging.
  
 
==Electrics rework to support a new hob==
 
==Electrics rework to support a new hob==
Line 42: Line 57:
 
[[Category:Projects]]
 
[[Category:Projects]]
 
[[Category:Infrastructure]]
 
[[Category:Infrastructure]]
 +
[[Category:Redecoration and refit]]

Latest revision as of 00:03, 28 February 2019

Kitchen Revamp
Project Kitchen Revamp.jpeg
Primary Contact
Created 23/05/2015
Completed 27/10/2018
Dormant
Version
Members Various
Manufacturer {{{manufacturer}}}
Model {{{model}}}
Location [[{{{location}}}]]
GitHub / Repo {{{repo}}}
Status Complete
Type Hackspace Infrastructure
Live Status
QR code

After the Comfy Area had been revamped some members felt it was time to revamp the Kitchen a little.

This project has been completed and there no further plans to upgrade the Kitchen. The floor/painting and general clear out was done in summer 2018. Below is a record of plans outlined previously around 2016. Next job is likely the cupboards some of which are sagging.

Electrics rework to support a new hob

The sockets currently over the kitchen counter need moving and their supply cables rearranging.
A new feed for the hob will need fitting from the distribution board
Estimated cost £50
Estimated time required 1-2 days

New kitchen hob

Chosen for it's robustness based on experience of these in rented (i.e. multi-use) residences.

ElectrIQ Ceramic 60cm Touch Control hob Vitro Glass Black
http://www.appliancesdirect.co.uk/p/eiqehceramictouch60/electriq-eiqehceramictouch60-4-zone-ceramic-hob
Cost £120
Time to install 1/2 day

Hob extractor

ElectriQ eIQCHCGBB70 70cm Curved Black Glass Cooker Hood Satin Black
http://www.appliancesdirect.co.uk/p/eiqchcgbb70/electriq-eiqchcgbb70-70cm-chimney-hood
Cost £95
Time to install 1/4 day

New floor

Replaced 2018, vinyl over harboard.

Fixing up the Oven cabinet

It should be on legs and fit nicer under the worktop.
In fact a new carcass would only cost £33 from B&Q
IT Kitchens White Melamine Oven Unit Carcass (W)600mm
http://www.diy.com/rooms/it-kitchens-white-melamine-oven-unit-carcass-w600mm/37271_BQ.prd
Time 1/4 day

New sink Tap

Boston Chrome Effect Pillar Tap
http://www.diy.com/departments/boston-chrome-effect-pillar-tap/38614_BQ.prd
Cost £23
Time 1/2 day