User:Lwk: Difference between revisions
Jump to navigation
Jump to search
(5 intermediate revisions by the same user not shown) | |||
Line 21: | Line 21: | ||
* Airsoft (not paintball) | * Airsoft (not paintball) | ||
* Remote controlled Heli's | * Remote controlled Heli's | ||
== Things to learn == | |||
In no order | |||
* EMC2 | |||
* Draftsight | |||
* TI MSP430 | |||
* TI CC1110 | |||
* HTML 5 | |||
* WebSockets | |||
* Plasma Cutting | |||
* iOS Dev / cocoa | |||
* openvpn | |||
* uIP stack | |||
* arc welding | |||
* tig welding | |||
== Current Projects == | == Current Projects == | ||
Line 39: | Line 55: | ||
== I Can Be Found At... == | == I Can Be Found At... == | ||
The Hackspace almost every Wednesday night | The Hackspace almost every Wednesday night | ||
#nottinghack irc channel on freenode as | |||
<nowiki>#</nowiki>nottinghack irc channel on freenode as LWK etc | |||
==ToDo Sandbox== | ==ToDo Sandbox== | ||
* More shelving for Members Box Room | * More shelving for Members Box Room | ||
** current count is space for ''' | ** current count is space for '''40''' | ||
** members box needs 52x42x28cm min, two stacked need ~60cm height | ** members box needs 52x42x28cm min, two stacked need ~60cm height | ||
** <s>rearrange current shelves to make room for a row on the floor,</s> add's another '''4''' --[[User:Lwk|'RepRap' Matt]] 00:40, 20 June 2011 (BST) done | ** <s>rearrange current shelves to make room for a row on the floor,</s> add's another '''4''' --[[User:Lwk|'RepRap' Matt]] 00:40, 20 June 2011 (BST) done | ||
** need a worktop under window | ** <s>need a worktop under window</s> | ||
*** have 1.1m under window, 2m in length | *** have 1.1m under window, 2m in length | ||
*** window to current racking is 1.2m, need to keep 70cm min gap, so worktop of 52cm deep just fits | *** window to current racking is 1.2m, need to keep 70cm min gap, so worktop of 52cm deep just fits |
Latest revision as of 21:08, 18 January 2020
Lwk | |
---|---|
Name | Matt Lloyd AKA 'RepRap' Matt |
NottingHacks resident RepRap 3D printer expert, and go to guy for electronic's, Arudino's, mbed's, electrical work, and just about anything else.
Matt 'RepRap' Lloyd --Lwk 22:52, 2 February 2011 (GMT)
Areas of interest and/or skill
- RepRap & 3D Printing
- Electronics
- Arduino and mbed firmware
- C, C++, PHP, HTML, Java(tried it), Perl(very rusty), 8086 Assembly(Forgotten details)
- Linux, OS X
- Electrics, plumbing, general building works. ( the fancy name for my day job is Property Developer)
- Joinery
- Twisty Puzzles
- Welding(self taught)
- Computer repair (part owner of MJ's Computers in Kirkby-in-Ashfield)
- Water cooled and over clocked pc's
- Airsoft (not paintball)
- Remote controlled Heli's
Things to learn
In no order
- EMC2
- Draftsight
- TI MSP430
- TI CC1110
- HTML 5
- WebSockets
- Plasma Cutting
- iOS Dev / cocoa
- openvpn
- uIP stack
- arc welding
- tig welding
Current Projects
In no really order or and state of progress.
- My RepRap Mendel and Building a Prusa Mendel for the space
- Arduino tank
- Nixie tube clock (built, Warm Tube Clock v1)
- HackSpace Instrumentation
- Gatekeeper
- LED Matrix Board
- Space energy monitor
- Space Occupancy Counter
- LED Cube (5x5x5)
- OLED Arduino Watch
- mbed temp data logger
I Can Be Found At...
The Hackspace almost every Wednesday night
#nottinghack irc channel on freenode as LWK etc
ToDo Sandbox
- More shelving for Members Box Room
- current count is space for 40
- members box needs 52x42x28cm min, two stacked need ~60cm height
rearrange current shelves to make room for a row on the floor,add's another 4 --'RepRap' Matt 00:40, 20 June 2011 (BST) doneneed a worktop under window- have 1.1m under window, 2m in length
- window to current racking is 1.2m, need to keep 70cm min gap, so worktop of 52cm deep just fits
- two shelves under and one box on floor, 3 box's high, can fit 5 wide in 2m, so 15 extra box's!!!
- remove current desk, leaves wall for more boxes, 1.7m wide, 2.3m tall aobut 4x7 box's, another 28, would need racking or shelves
- have potential for a total of 72 boxes
- When do you want to do this? I'm happy to help! James 16:46, 19 June 2011 (BST)
- need to get wood supplies, once i do some design plans, need to finish workshop bench first --'RepRap' Matt 00:40, 20 June 2011 (BST)
- Members Storage
- old pc's need a sort and better stacking
- sort top shelf, to be use for members only equipment that need securing (projector, xbox, ps3) also long term storage
- donation box system sorted, needs a regular check and empty
- lower shelves for short term members project/overflow storage
- DnD boads? can we find some were neater to store
- laser tag? who's can we find a better box
- network patch panel above the internet
- possibly narrow shelves under and above window?
- workshop bench
- fix legs, add mid point leg?
- side brace
- chop saw shelf
- room under chop saw for dust extractor
- pigeon holes under bench for power tools
Wish List's
Need adding to correct lists
- Miter box
- Indian sharpening stone
- 3-1 Oil
- +2 paper
- Webcams
- RFID readers
Buzzer button for downstairs- Clark cdp5dd pilar drill
- Green pla to print RepRap. Vik
- LCD Monitors
Cat 5 patch cables, 1m, 2m, 30cmSure Electronics DE-DP14211 3216 Bicolor LED 5mm Dot Matrix Display Information Board