Bridgeport Mill Induction Checklist: Difference between revisions
mNo edit summary |
No edit summary |
||
Line 172: | Line 172: | ||
</ul> | </ul> | ||
</li> | </li> | ||
</ul> | |||
<td style="font-weight:bold;border:1px solid black;" /> | |||
</tr> | |||
<tr> | |||
<td style="border:1px solid black;"> | |||
<b>Cleaning up</b><br> | |||
<b>Please ensure you clean and tidy the machine after you finish working.</b><br> | |||
Ensure that: | |||
<ul> | |||
<li>The main power is off.</li> | |||
<li>All the switches on the front panel are off.</li> | |||
<li><b>The bed is free of swarf and debris.</b></li> | |||
<li>There is no tool in the spindle.</li> | |||
<li>The autofeed is set to disengaged, i.e. in the middle position.</li> | |||
<li>The spindle motor is disengaged via the middle position on the spindle direction switch.</li> | |||
<li>The quill feed is retracted and locked.</li> | |||
</ul> | </ul> | ||
<td style="font-weight:bold;border:1px solid black;" /> | <td style="font-weight:bold;border:1px solid black;" /> |
Revision as of 20:49, 12 August 2019
Induction Check Sheet | |
Bridgeport Milling Machine | |
Inductee level of experience with similar machinery: | |
Safety | Completed Tasks |
Personal Protective Equipment (PPE):
These all have the potential to get caught in the moving parts of the machine. The list is not exhaustive and it is on the operator to apply common sense. |
|
Surroundings and Setup
These all have the potential to get caught in the moving parts of the machine. The list is not exhaustive and it is on the operator to apply common sense. |
|
Preventative Maintenance |
|
Main Controls
|
|
Moving the Bed
| |
Changing Spindle Speed
| |
Changing Tool
| |
Digital Read Out (DRO)
| |
Rapid Feed
| |
Cleaning up
|