Locking up: Difference between revisions

From Nottinghack Wiki
Jump to navigation Jump to search
No edit summary
Line 15: Line 15:
See the diagram for locations.
See the diagram for locations.


==Heater==
==Heating==


There is a propane heater that is often used on Wednesday evenings in winter. It has no fixed location in the hackspace. Obviously, this needs turning off as well.
There is a propane heater that is often used on Wednesday evenings in winter. It has no fixed location in the hackspace. Obviously, this needs turning off as well.

Revision as of 15:47, 14 February 2012

Diagram showing switches and security items.
(Download original SVG)

Security

The following must be done when locking-up.

  1. Ensure the back door in the workshop is closed
  2. The members room door must be pulled shut.
  3. The members project box area door must be pulled shut.
  4. Inner main door must be taken off the latch.
  5. Padlock must be replaced on outer main door, as usual.

See the diagram for locations.

Heating

There is a propane heater that is often used on Wednesday evenings in winter. It has no fixed location in the hackspace. Obviously, this needs turning off as well.

Lights

There are several main light switches around the space. Additionally, after an open evening, there are usually several other lights, lamps and lit decorations that will also need to be turned off.

main light switch
chest-level plug socket
floor-level plug socket

See the diagram for the locations of switches.