| There is a plan to move the Hackspace instrumentation devices onto there own network running on a 2nd network card that is yet to be installed in Holly,
| |
| This will likely have it's own ip range
| |
| --[[User:Lwk|'RepRap' Matt]] 14:52, 11 August 2011 (BST)
| |
|
| |
|
| == Patch Panel and Wiring ==
| |
|
| |
| I am gradually extending the number of wired Ethernet points around the Hackspace.
| |
|
| |
| Progress so far:
| |
|
| |
| Main area - 4 twin points above desk height.
| |
|
| |
| Studio area - 1 twin point at floor level.
| |
|
| |
| All wired to patch panel next to Holly, 'live' sockets are the first / lefthand one on each point (1, 3, 5, 7, 9).
| |
|
| |
| Points currently awaiting wiring / termination:
| |
|
| |
| Electronics bench (1) Blue room (3 x 2)
| |
|
| |
| Others to be added as locations become appropriate.
| |
| --[[User:Dclarke|Dclarke]] 12:24, 26 January 2012 (EST)
| |