Hackspace 2.5/ToDo: Difference between revisions
Jump to navigation
Jump to search
Created initial to do list |
No edit summary |
||
| (15 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
= | =Metalworking= | ||
==Electrical== | |||
* Hang lights ✅ (complete except grinding room + one in far corner) | |||
* Install conduit ✅ | |||
* Install trunking ✅ | |||
* Pull cable ✅ | |||
* Install temporary control box / switching solution ✅ | |||
* Install control box feed (10A RCBO from main board, PVC conduit) ✅ | |||
* Test & Inspection ✅ | |||
* Remove last of temporary lighting solution ✅ | |||
* 13A power circuit on near wall ✅ | |||
* 13A power circuit on dance studio wall ✅ | |||
* Welding interlock (WIP) | |||
* Heavy feed to interlock box (D63 - reuse from metalworking feed upstairs?) | |||
* Install welding sockets - will require them being removed from upstairs | |||
* Test & Inspection | |||
* Make and install unistrut post for bandsaw socket | |||
* 16/3 Socket for bandsaw (SWA on tray from DB down post to RCD in small box, RCD to socket) | |||
* Complete traywork install | |||
* Make and install rest of unistrut posts | |||
* Install back wall small power circuit | |||
* Install posts small power circuit (routing???) | |||
* Corridor power circuit (PVC conduit) | |||
* Install power for compressor (seperate feed, or tacked on to the end of the corridor power circuit) | |||
* Test & Inspection, issue EIC | |||
===Blocked Tasks=== | |||
* All of small grinding room | |||
* Hanging final light | |||
== | ==Non-Electrical== | ||
* Put the rest of the diffusers on the lights | |||
* Plug in the batteries on the emergency lights (technically electrical I suppose) | |||
* Move door currently on grinding room to far end of room | |||
* Establish what else needs to be done to the grinding room before it's sensible to install electrics in there (finish walls, boxing, etc) | |||
* Move stuff out of the way (particularly the pallet of metal things and the Warco - eek.) | |||
* Design and install curtains/other dividing solution between welding quarter and the rest of the room to ensure that grinding dust is mostly kept out of the rest of the area | |||
* Design and install ventilation setup for welding | |||
* Finish ceiling in far corner of main space to allow final light to be hung | |||
* Data cabling for NH-Tools | |||
* Move tools / benches etc into place! | |||
* Handles for doors | |||
* Investigate possible leak in grinding room? | |||
== | ==Epilogue== | ||
* Christen the room by smashing a bottle of Lucozade on it's bow (step one, find its bow...) | |||
* Remove all infra tools/supplies from Downstairs Members' Storage to Team Storage | |||
* Consider fire door (opening inwards probably not acceptable?) | |||
* Have Schneider DB disconnected and sell it on eBay | |||
* Tactically acquire vending machine for grinding discs and other consumables | |||
* Pub | |||
== | ===Bike Area=== | ||
* Install Panel Lights | |||
Latest revision as of 01:28, 29 January 2026
Metalworking
Electrical
- Hang lights ✅ (complete except grinding room + one in far corner)
- Install conduit ✅
- Install trunking ✅
- Pull cable ✅
- Install temporary control box / switching solution ✅
- Install control box feed (10A RCBO from main board, PVC conduit) ✅
- Test & Inspection ✅
- Remove last of temporary lighting solution ✅
- 13A power circuit on near wall ✅
- 13A power circuit on dance studio wall ✅
- Welding interlock (WIP)
- Heavy feed to interlock box (D63 - reuse from metalworking feed upstairs?)
- Install welding sockets - will require them being removed from upstairs
- Test & Inspection
- Make and install unistrut post for bandsaw socket
- 16/3 Socket for bandsaw (SWA on tray from DB down post to RCD in small box, RCD to socket)
- Complete traywork install
- Make and install rest of unistrut posts
- Install back wall small power circuit
- Install posts small power circuit (routing???)
- Corridor power circuit (PVC conduit)
- Install power for compressor (seperate feed, or tacked on to the end of the corridor power circuit)
- Test & Inspection, issue EIC
Blocked Tasks
- All of small grinding room
- Hanging final light
Non-Electrical
- Put the rest of the diffusers on the lights
- Plug in the batteries on the emergency lights (technically electrical I suppose)
- Move door currently on grinding room to far end of room
- Establish what else needs to be done to the grinding room before it's sensible to install electrics in there (finish walls, boxing, etc)
- Move stuff out of the way (particularly the pallet of metal things and the Warco - eek.)
- Design and install curtains/other dividing solution between welding quarter and the rest of the room to ensure that grinding dust is mostly kept out of the rest of the area
- Design and install ventilation setup for welding
- Finish ceiling in far corner of main space to allow final light to be hung
- Data cabling for NH-Tools
- Move tools / benches etc into place!
- Handles for doors
- Investigate possible leak in grinding room?
Epilogue
- Christen the room by smashing a bottle of Lucozade on it's bow (step one, find its bow...)
- Remove all infra tools/supplies from Downstairs Members' Storage to Team Storage
- Consider fire door (opening inwards probably not acceptable?)
- Have Schneider DB disconnected and sell it on eBay
- Tactically acquire vending machine for grinding discs and other consumables
- Pub
Bike Area
- Install Panel Lights