Hackspace 2.5/ToDo: Difference between revisions

From Nottinghack Wiki
Jump to navigation Jump to search
Alexmann (talk | contribs)
No edit summary
 
(4 intermediate revisions by 3 users not shown)
Line 1: Line 1:
==Blue Side==
===Metalworking===


# Gatekeeper entry (lift end)
====Phase Zero: Lighting====
# Gatekeeper entry (communal end)
# Lighting Control Tablets
# Brackets and power for tablet (microusb) - Alex Mann looking at


===Blue Room===
Electrical:
* Hang lights (done, except grinding room + one in far corner)
* Install conduit (done)
* Install trunking (WIP)
* Pull cable
* Install temporary control box / switching solution
* Install control box feed (10A RCBO from main board, PVC conduit)
* Test & Inspection, issue EIC
* Remove last of temporary lighting solution


# Worktop Surface (needs buying)
Non-electrical:
# Sink installation
* Finish ceiling in far corner to allow final light to be hung
# Sink plumbing (needs buying)


===CNC Room===
====Phase One: Welding & Grinding====


# Bench along wall (needs planning and wood buying)
Electrical:
# Laser Extraction
* Welding interlock (WIP)
# Laser PC Bench (needs planning and wood buying)
* Heavy feed to interlock box (D63 - reuse from metalworking feed upstairs?)
* Install welding sockets - will require them being removed from upstairs (trunking/SWA)
* 16/3 supply to grinding room, but see below
* Install small power circuit to bay (galv conduit)
* Test & Inspection, issue EIC


==Front Side==
Non-electrical:
* Move door from grinding room to far end of room
* Establish what else needs to be done to the grinding room before it's sensible to install electrics in there (finish walls, boxing, etc)
* Move stuff out of the way (particularly the pallet of metal things and the Warco - eek.)
* Install curtains/other dividing to ensure that grinding dust is kept out of the rest of the area
* Consider the ventilation situation


===Members Storage===
====Phase Two: The rest====


# Lighting
Electrical:
# Gatekeeper entry
* Complete the traywork
* Heavy feeds (3x 16/3)
* Small power circuits (galv conduit)
* Corridor power circuit (PVC conduit)
* Install power for compressor (seperate feed or tacked on to the end of the corridor power circuit)
* Test & Inspection, issue EIC


===Classroom===
Non-electrical:
* Install unistrut posts on the pillars ala Dusty Area
* Remove random leftover wood, insulation, etc
* Data cabling for NH-Tools
* Move tools / benches etc into place!


# Floor needs hardboard
====Epilogue====
# Floor needs carpet tiling (need to buy spray adhesive)
* Christen the room by smashing a bottle of Lucozade on it's bow (step one, find its bow...)  
# Interactive whiteboard (needs buying)
* Remove all infra tools/supplies from Downstairs Members' Storage to Team Storage
# Projector and mount (needs buying)
* Consider fire door (opening inwards probably not acceptable?)  
# Laptop input system (needs buying)
* Have Schneider DB disconnected and sell it on eBay
# Desks (needs buying)
* Pub
# Shelving (needs buying or planning and building)
# Walls need plastering
# Walls need sealing
# Walls need painting
# Gaps need filling
# Lighting
 
===Corridor===
 
# Floor needs sanding
# Floor needs painting (needs buying)
# Lighting
# Lighting Control Tablets (need buying)
# Lighting Control tablet mounts (need buying) - Alex Looking At
 
===Metalworking===

Latest revision as of 22:26, 3 September 2025

Metalworking

Phase Zero: Lighting

Electrical:

  • Hang lights (done, except grinding room + one in far corner)
  • Install conduit (done)
  • Install trunking (WIP)
  • Pull cable
  • Install temporary control box / switching solution
  • Install control box feed (10A RCBO from main board, PVC conduit)
  • Test & Inspection, issue EIC
  • Remove last of temporary lighting solution

Non-electrical:

  • Finish ceiling in far corner to allow final light to be hung

Phase One: Welding & Grinding

Electrical:

  • Welding interlock (WIP)
  • Heavy feed to interlock box (D63 - reuse from metalworking feed upstairs?)
  • Install welding sockets - will require them being removed from upstairs (trunking/SWA)
  • 16/3 supply to grinding room, but see below
  • Install small power circuit to bay (galv conduit)
  • Test & Inspection, issue EIC

Non-electrical:

  • Move door from grinding room to far end of room
  • Establish what else needs to be done to the grinding room before it's sensible to install electrics in there (finish walls, boxing, etc)
  • Move stuff out of the way (particularly the pallet of metal things and the Warco - eek.)
  • Install curtains/other dividing to ensure that grinding dust is kept out of the rest of the area
  • Consider the ventilation situation

Phase Two: The rest

Electrical:

  • Complete the traywork
  • Heavy feeds (3x 16/3)
  • Small power circuits (galv conduit)
  • Corridor power circuit (PVC conduit)
  • Install power for compressor (seperate feed or tacked on to the end of the corridor power circuit)
  • Test & Inspection, issue EIC

Non-electrical:

  • Install unistrut posts on the pillars ala Dusty Area
  • Remove random leftover wood, insulation, etc
  • Data cabling for NH-Tools
  • Move tools / benches etc into place!

Epilogue

  • Christen the room by smashing a bottle of Lucozade on it's bow (step one, find its bow...)
  • Remove all infra tools/supplies from Downstairs Members' Storage to Team Storage
  • Consider fire door (opening inwards probably not acceptable?)
  • Have Schneider DB disconnected and sell it on eBay
  • Pub