Power: Difference between revisions
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
This page details how the mains has been installed at the space. | |||
==F6== | ==F6== | ||
Line 130: | Line 131: | ||
[[Category:Infrastructure]] | [[Category:Infrastructure]] | ||
[[Category:Power_source]] |
Revision as of 08:44, 16 February 2019
This page details how the mains has been installed at the space.
F6
Craft Room
This board has the old phase cable colours.
It now contains a mixture of old wiring colours and new wiring colours.
CABLESIZE | MCBSIZE | CIRCUIT | PHASE | PHASE | CIRCUIT | MCBSIZE | CABLESIZE | |
---|---|---|---|---|---|---|---|---|
2.5MM | C16 | SERVER UPS | BR1 | BR7 | SPIRAL STAIRS LIGHTS (COMUNAL) | B6 | 1.5MM | |
2.5MM | C32 | KITCHEN RING | BK1 | BK7 | BOX ROOM LIGHTS | B6 | 1.5MM | |
2.5MM | C32 | BLUE ROOM | GY1 | GY7 | LIGHTS IN ALL AREAS BEFORE WORKSHOP | B6 | 1.5MM | |
BR2 | BR8 | 16amp | ||||||
BBK2 | BBK8 | 16amp | ||||||
GY2 | GY8 | WORKSHOP DIS BOARD (ABOVE DOOR) | 50 amp | 4/6 ?? | ||||
BR3 | BR9 | 16amp | ||||||
BBK3 | BBK9 | 16amp | ||||||
GY3 | GY9 | STUDIO PILLAR (VENDING MACHINE) | 16AMP | 2.5MM | ||||
BR4 | BR10 | |||||||
BBK4 | BBK10 | |||||||
GY4 | GY10 | |||||||
BR5 | BR11 | |||||||
BBK5 | BBK11 | |||||||
GY5 | GY11 | |||||||
BR6 | BR12 | |||||||
BBK6 | BBK12 | |||||||
GY6 | GY12 |
Workshop
This board is on L3.
It is fed from a 50amp circuit breaker in the power cupboard
MetalWorking
G4 & G5
G4
G5
This board is is on L3.