Power: Difference between revisions

From Nottinghack Wiki
Jump to navigation Jump to search
No edit summary
Smith2189 (talk | contribs)
Line 41: Line 41:
|-
|-
| || ||  
| || ||  
| style="background-color:#000000;  color:#ffffff;" | BBK2 || || style="background-color:#000000;  color:#ffffff;" | BBK8
| style="background-color:#000000;  color:#ffffff;" | BK2 || || style="background-color:#000000;  color:#ffffff;" | BBK8
| || 16amp ||  
| || 16amp ||  
|-
|-
Line 53: Line 53:
|-
|-
| || ||  
| || ||  
| style="background-color:#000000;  color:#ffffff;" | BBK3 || || style="background-color:#000000;  color:#ffffff;" | BBK9
| style="background-color:#000000;  color:#ffffff;" | BK3 || || style="background-color:#000000;  color:#ffffff;" | BBK9
| || 16amp ||  
| || 16amp ||  
|-
|-
Line 65: Line 65:
|-
|-
| || ||  
| || ||  
| style="background-color:#000000;  color:#ffffff;" | BBK4 || || style="background-color:#000000;  color:#ffffff;" | BBK10
| style="background-color:#000000;  color:#ffffff;" | BK4 || || style="background-color:#000000;  color:#ffffff;" | BBK10
| || ||  
| || ||  
|-
|-
Line 77: Line 77:
|-
|-
| || ||  
| || ||  
| style="background-color:#000000;  color:#ffffff;" | BBK5 || || style="background-color:#000000;  color:#ffffff;" | BBK11
| style="background-color:#000000;  color:#ffffff;" | BK5 || || style="background-color:#000000;  color:#ffffff;" | BBK11
| || ||  
| || ||  
|-
|-
Line 89: Line 89:
|-
|-
| || ||  
| || ||  
| style="background-color:#000000;  color:#ffffff;" | BBK6 || || style="background-color:#000000;  color:#ffffff;" | BBK12
| style="background-color:#000000;  color:#ffffff;" | BK6 || || style="background-color:#000000;  color:#ffffff;" | BBK12
| || ||  
| || ||  
|-
|-

Revision as of 09:11, 23 February 2019

This page details how the mains power has been installed at the space.

F6

Craft Room

This board has the old phase cable colours.
It now contains a mixture of old wiring colours and new wiring colours.

CABLESIZE MCBSIZE CIRCUIT PHASE PHASE CIRCUIT MCBSIZE CABLESIZE
2.5MM C16 SERVER UPS BR1 BR7 SPIRAL STAIRS LIGHTS (COMUNAL) B6 1.5MM
2.5MM C32 KITCHEN RING BK1 BK7 BOX ROOM LIGHTS B6 1.5MM
2.5MM C32 BLUE ROOM GY1 GY7 LIGHTS IN ALL AREAS BEFORE WORKSHOP B6 1.5MM
BR2 BR8 16amp
BK2 BBK8 16amp
GY2 GY8 WORKSHOP DIS BOARD (ABOVE DOOR) 50 amp 4/6 ??
BR3 BR9 16amp
BK3 BBK9 16amp
GY3 GY9 STUDIO PILLAR (VENDING MACHINE) 16AMP 2.5MM
BR4 BR10
BK4 BBK10
GY4 GY10
BR5 BR11
BK5 BBK11
GY5 GY11
BR6 BR12
BK6 BBK12
GY6 GY12

Workshop

This board is on L3.
It is fed from a 50amp circuit breaker in the power cupboard

MetalWorking

G4 & G5

G4

G5

This board is is on L3.

G6