Talk:Network: Difference between revisions
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
Studio area - 1 twin point at floor level. | Studio area - 1 twin point at floor level. | ||
Textile room / Recording studio - 1 single point above desk height (23). | |||
Vending Machine - 1 single point on wall (22). | |||
'live' sockets are the first / lefthand one on each point (1, 3, 5, 7, 9), plus the single points. | |||
Points currently awaiting wiring / termination: | Points currently awaiting wiring / termination: |
Revision as of 17:30, 26 January 2012
There is a plan to move the Hackspace instrumentation devices onto there own network running on a 2nd network card that is yet to be installed in Holly, This will likely have it's own ip range --'RepRap' Matt 14:52, 11 August 2011 (BST)
Patch Panel and Wiring
Ceiling-mounted 48-way patch panel installed next to Holly --Dclarke 12:28, 26 January 2012 (EST)
I am gradually extending the number of wired Ethernet points around the Hackspace.
Progress so far:
Main area - 4 twin points above desk height.
Studio area - 1 twin point at floor level.
Textile room / Recording studio - 1 single point above desk height (23).
Vending Machine - 1 single point on wall (22).
'live' sockets are the first / lefthand one on each point (1, 3, 5, 7, 9), plus the single points.
Points currently awaiting wiring / termination:
Electronics bench (1) Blue room (3 x 2)
Others to be added as locations become appropriate. Please let me know.--Dclarke 12:28, 26 January 2012 (EST)