Power
Jump to navigation
Jump to search
This page details how the mains power has been installed at the space.
F6
Craft Room
This board has the old phase cable colours.
It now contains a mixture of old wiring colours and new wiring colours.
CABLESIZE | MCBSIZE | CIRCUIT | PHASE | PHASE | CIRCUIT | MCBSIZE | CABLESIZE | |
---|---|---|---|---|---|---|---|---|
2.5MM | C16 | SERVER UPS | BR1 | BR7 | SPIRAL STAIRS LIGHTS (COMUNAL) | B6 | 1.5MM | |
2.5MM | C32 | KITCHEN RING | BK1 | BK7 | BOX ROOM LIGHTS | B6 | 1.5MM | |
2.5MM | C32 | BLUE ROOM | GY1 | GY7 | LIGHTS IN ALL AREAS BEFORE WORKSHOP | B6 | 1.5MM | |
BR2 | BR8 | 16amp | ||||||
BBK2 | BBK8 | 16amp | ||||||
GY2 | GY8 | WORKSHOP DIS BOARD (ABOVE DOOR) | 50 amp | 4/6 ?? | ||||
BR3 | BR9 | 16amp | ||||||
BBK3 | BBK9 | 16amp | ||||||
GY3 | GY9 | STUDIO PILLAR (VENDING MACHINE) | 16AMP | 2.5MM | ||||
BR4 | BR10 | |||||||
BBK4 | BBK10 | |||||||
GY4 | GY10 | |||||||
BR5 | BR11 | |||||||
BBK5 | BBK11 | |||||||
GY5 | GY11 | |||||||
BR6 | BR12 | |||||||
BBK6 | BBK12 | |||||||
GY6 | GY12 |
Workshop
This board is on L3.
It is fed from a 50amp circuit breaker in the power cupboard
MetalWorking
G4 & G5
G4
G5
This board is is on L3.