Talk:2012-05-09 Agenda: Difference between revisions

From Nottinghack Wiki
Jump to navigation Jump to search
 
(8 intermediate revisions by 2 users not shown)
Line 1: Line 1:
You can use this page to suggest additions to the agenda.  Ensure you sign your comments with four tildes (<nowiki>~~~~</nowiki>) [[User:James|James]] 13:21, 8 May 2012 (EST)
You can use this page to suggest additions to the agenda.  Ensure you sign your comments with four tildes (<nowiki>~~~~</nowiki>) [[User:James|James]] 13:21, 8 May 2012 (EST)


== Debry and Manchester Mini Maker Faire ==
== Derby and Manchester Mini Maker Faire ==


Just want a bring these up, in brief. Quick run though for derby and are we going to Manchester?
Just want a bring these up, in brief. Quick run though for derby and are we going to Manchester?
Also i suspect Brigthon might be on again in september
Also i suspect Brigthon might be on again in september
--[[User:Lwk|&#39;RepRap&#39; Matt]] 13:36, 8 May 2012 (EST)
--[[User:Lwk|&#39;RepRap&#39; Matt]] 13:36, 8 May 2012 (EST)
== Relays for lighting automation ==
i'd like to buy 17 relays use with with lighting automation project, from rapid, at the same time Matt Little said we need to get some battery clips for the badges--[[User:Lwk|&#39;RepRap&#39; Matt]] 13:46, 8 May 2012 (EST)
== Hacking the space Tuesday Evenings ==
I would like to bring to the attention of the meeting the [[Hacking The Space]] wiki page, and report on what has been achieved so far. There are only two more Tuesday evenings before the Open Day, and these are an opportunity to get the space into better shape for that event.
Anyone wanting more details of what I have in mind for any items, please get in touch with me -I don't want to do all of this myself.
Wood-rack improvements. Cabbage Trays aquired - can use for smaller timber.
Screwdriver rack improvements.
Toolboard - started-hanging some tools, added row of hooks for spanner set.
Lightimg improvements - ongoing (Thanks, Tom!)
Network improvements - ongoing.
Integrated Circuit green chest - fitted legs, sorted contents and temporary labels.
Roller blind in comfy area repaired and re-hung.
Three pen-pots fitted in studio.
David Clarke (I will be at the space until about 6:30 only this evening)
[[User:Dclarke|Dclarke]] 03:35, 9 May 2012 (EST)
PS: I have just submitted this topic at 9:35 Wednesday morning, but the wiki signature shows 03:35 EST - do we have control over the timezone setting?

Latest revision as of 08:44, 9 May 2012

You can use this page to suggest additions to the agenda. Ensure you sign your comments with four tildes (~~~~) James 13:21, 8 May 2012 (EST)

Derby and Manchester Mini Maker Faire

Just want a bring these up, in brief. Quick run though for derby and are we going to Manchester? Also i suspect Brigthon might be on again in september --'RepRap' Matt 13:36, 8 May 2012 (EST)

Relays for lighting automation

i'd like to buy 17 relays use with with lighting automation project, from rapid, at the same time Matt Little said we need to get some battery clips for the badges--'RepRap' Matt 13:46, 8 May 2012 (EST)

Hacking the space Tuesday Evenings

I would like to bring to the attention of the meeting the Hacking The Space wiki page, and report on what has been achieved so far. There are only two more Tuesday evenings before the Open Day, and these are an opportunity to get the space into better shape for that event.

Anyone wanting more details of what I have in mind for any items, please get in touch with me -I don't want to do all of this myself.

Wood-rack improvements. Cabbage Trays aquired - can use for smaller timber. Screwdriver rack improvements. Toolboard - started-hanging some tools, added row of hooks for spanner set. Lightimg improvements - ongoing (Thanks, Tom!) Network improvements - ongoing. Integrated Circuit green chest - fitted legs, sorted contents and temporary labels. Roller blind in comfy area repaired and re-hung. Three pen-pots fitted in studio.

David Clarke (I will be at the space until about 6:30 only this evening) Dclarke 03:35, 9 May 2012 (EST)

PS: I have just submitted this topic at 9:35 Wednesday morning, but the wiki signature shows 03:35 EST - do we have control over the timezone setting?