Created page with "Lets make up a batch of hackbrew while learning the process involved. This would mean sorting out the equipment (including building a brew chiller). '''Date''' TBC '''Organise..." |
No edit summary |
||
Line 1: | Line 1: | ||
Lets make up a batch of hackbrew while learning the process involved. This | Lets make up a batch of hackbrew while learning the process involved. | ||
This will be a one-day session where a number of batches of home-brewed beer (some ale and some lager) will be made. | |||
The beer will need to be racked 1 week later and bottled 1 week after that. | |||
We are planning on building a 'brew station' where all the equipment can be stored and brews can be easily be made. | |||
There are three main steps: | |||
Mash | |||
Boil | |||
Ferment | |||
Hence the brew station will have three steps (one for each process) | |||
This required (please cross through and write a note if you can supply): | |||
Fermentation bins with lids x 3 (Matt to supply 1) | |||
Heated brew bin x 1 | |||
Insulated brew bin x 1 | |||
(this could be a large old ice box or some kingspan insulation around a fermentation bin) | |||
Hydrometer x 1 (Matt to supply) | |||
Tank fitting (for water tank connections) x 2 | |||
15mm copper pipe x some | |||
Taps for 15mm copper pipe x 2 | |||
2" x 2" wood to build racks (Matt to supply some) | |||
Copper tubing - for making a chiller | |||
Any brewing related equipment | |||
Plastic spoons | |||
Lots and lots of plastic/glass bottles. The PET 2l plastic pop work well - please save them... | |||
Ingredients for the beer: | |||
Malted grain x 25kg | |||
Hops x various types x 5kg | |||
Yeast | |||
Sterilising powder | |||
'''Date''' TBC | '''Date''' TBC | ||
'''Organisers''' Matt Little/ | '''Organisers''' Matt Little/ Andy | ||
[[Category:Events]] | [[Category:Events]] |
Revision as of 21:57, 24 May 2011
Lets make up a batch of hackbrew while learning the process involved. This will be a one-day session where a number of batches of home-brewed beer (some ale and some lager) will be made. The beer will need to be racked 1 week later and bottled 1 week after that. We are planning on building a 'brew station' where all the equipment can be stored and brews can be easily be made. There are three main steps: Mash Boil Ferment
Hence the brew station will have three steps (one for each process)
This required (please cross through and write a note if you can supply): Fermentation bins with lids x 3 (Matt to supply 1) Heated brew bin x 1 Insulated brew bin x 1 (this could be a large old ice box or some kingspan insulation around a fermentation bin) Hydrometer x 1 (Matt to supply) Tank fitting (for water tank connections) x 2 15mm copper pipe x some Taps for 15mm copper pipe x 2 2" x 2" wood to build racks (Matt to supply some) Copper tubing - for making a chiller Any brewing related equipment Plastic spoons Lots and lots of plastic/glass bottles. The PET 2l plastic pop work well - please save them...
Ingredients for the beer: Malted grain x 25kg Hops x various types x 5kg Yeast Sterilising powder
Date TBC
Organisers Matt Little/ Andy