Hack the Space Days/8th-10th Feb 2019: Difference between revisions
No edit summary |
|||
Line 1: | Line 1: | ||
= Studio Flooring Replacement = | ==Intro== | ||
We will be holding a Hack the Space weekend from 18:00 on Friday 8th February till 18:00 Sunday 10th February. '''During this time no normal project work will be happening.''' It'll be all hands on deck improving our space! | |||
Our Hackspace is only as great as our members make it so please join us. Regardless of if you can only spend 30 minutes or the whole weekend at the space; during this time any, and all, help will be greatly appreciated. | |||
This wiki page is interactive and is intended to detail exactly what needs doing so that we're all working towards the same goals. If you know of anything that needs fixing or looking at, feel free to add it to the list! In theory someone could turn up at 3am and complete some jobs off this list without anyone there to tell them what to do. You will see the page gradually change on the run up to the weekend as more teams & members populate it. | |||
== Studio Flooring Replacement == | |||
As many are aware the studio flooring is in desperate need of replacement after many years of surviving. I think for 2019 it is time for new flooring. During this time we will also be resetting LPS (Large Project Storage). Below are some of the jobs if you are interested in helping out | As many are aware the studio flooring is in desperate need of replacement after many years of surviving. I think for 2019 it is time for new flooring. During this time we will also be resetting LPS (Large Project Storage). Below are some of the jobs if you are interested in helping out | ||
Line 93: | Line 102: | ||
== | ==CNC Area== | ||
===Dust shoe for CNC Mill=== | |||
This is a low priority task that could be worked on if alone in the space during the shut down. | |||
It will probably require some 3D Modelling skill. | |||
The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover. | |||
Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html | |||
===Tool Storage Rack=== | |||
The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. Don't think any modelling skills will be required for this as there are lots of different solutions that could work. | |||
==Miscellaneous Jobs== | |||
*Redesigning the Large Project Storage Area | *Redesigning the Large Project Storage Area | ||
*Reorganise comfy area including rewiring of speakers | *Reorganise comfy area including rewiring of speakers | ||
*Checklist of tools and PAT testing | *Producing a Checklist of tools and PAT testing | ||
*Electrics within the workshop (replacing lights) etc | *Electrics within the workshop (replacing lights) etc | ||
*2.5 jobs TBC | *2.5 jobs TBC | ||
[[Category:Events]] | [[Category:Events]] |
Revision as of 00:58, 4 January 2019
Intro
We will be holding a Hack the Space weekend from 18:00 on Friday 8th February till 18:00 Sunday 10th February. During this time no normal project work will be happening. It'll be all hands on deck improving our space!
Our Hackspace is only as great as our members make it so please join us. Regardless of if you can only spend 30 minutes or the whole weekend at the space; during this time any, and all, help will be greatly appreciated.
This wiki page is interactive and is intended to detail exactly what needs doing so that we're all working towards the same goals. If you know of anything that needs fixing or looking at, feel free to add it to the list! In theory someone could turn up at 3am and complete some jobs off this list without anyone there to tell them what to do. You will see the page gradually change on the run up to the weekend as more teams & members populate it.
Studio Flooring Replacement
As many are aware the studio flooring is in desperate need of replacement after many years of surviving. I think for 2019 it is time for new flooring. During this time we will also be resetting LPS (Large Project Storage). Below are some of the jobs if you are interested in helping out
Studio Floor Replacement | ||||
---|---|---|---|---|
Job | Day | Deadline | Volunteers | Completed? |
Empty the Craft Room | Ongoing | N/A | ||
Empty Large Project Storage | TBC | Fri | ||
Replacement of Craft Room Floor | TBC | Fri | ||
Move Sewing Machines and Embrodery Machine | TBC | Fri | ||
Move Tables & Chairs to Workshop | Fri | Fri | ||
Move Vending Machines | Fri | Fri | ||
Remove Bench to workshop | Fri | Fri | ||
Removal of Workshop Floor | Fri / Sat (Morn) | Sat (AM) | ||
Prep floor for new flooring | Sat | Sat (PM) | ||
Lay new flooring | Sat / Sun | |||
Move Tables & Chairs back to workshop | Sun | |||
Move Vending Machines back | Sun | |||
Tidy and Drinks | Sun |
CNC Area
Dust shoe for CNC Mill
This is a low priority task that could be worked on if alone in the space during the shut down. It will probably require some 3D Modelling skill.
The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover. Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html
Tool Storage Rack
The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. Don't think any modelling skills will be required for this as there are lots of different solutions that could work.
Miscellaneous Jobs
- Redesigning the Large Project Storage Area
- Reorganise comfy area including rewiring of speakers
- Producing a Checklist of tools and PAT testing
- Electrics within the workshop (replacing lights) etc
- 2.5 jobs TBC