Hackspace 2.5/ToDo: Difference between revisions
Jump to navigation
Jump to search
m Danspencer101 moved page Project:Hackspace 2.5/ToDo to Hackspace 2.5/ToDo |
2.5 |
||
Line 49: | Line 49: | ||
===Metalworking=== | ===Metalworking=== | ||
==Resources== | |||
* [https://docs.google.com/spreadsheets/d/1XbSNJnP8_oexDjwUofOp42X2-66BOkI74F3CmDRL1uk/edit#gid=0 Hackspace 2.5 Tasks (Google spreadsheet)] - circa 2017 | |||
* [https://trello.com/b/wIdeNz1e/hackspace-25 Hackspace 2.5 (Trello)] - jobs list | |||
==See also== | |||
* [[Hackspace 2.5/ToBuy]] |
Revision as of 10:19, 4 April 2019
Blue Side
- Gatekeeper entry (lift end)
- Gatekeeper entry (communal end)
- Lighting Control Tablets
- Brackets and power for tablet (microusb) - Alex Mann looking at
Blue Room
- Worktop Surface (needs buying)
- Sink installation
- Sink plumbing (needs buying)
CNC Room
- Bench along wall (needs planning and wood buying)
- Laser Extraction
- Laser PC Bench (needs planning and wood buying)
Front Side
Members Storage
- Lighting
- Gatekeeper entry
Classroom
- Floor needs hardboard
- Floor needs carpet tiling (need to buy spray adhesive)
- Interactive whiteboard (needs buying)
- Projector and mount (needs buying)
- Laptop input system (needs buying)
- Desks (needs buying)
- Shelving (needs buying or planning and building)
- Walls need plastering
- Walls need sealing
- Walls need painting
- Gaps need filling
- Lighting
Corridor
- Floor needs sanding
- Floor needs painting (needs buying)
- Lighting
- Lighting Control Tablets (need buying)
- Lighting Control tablet mounts (need buying) - Alex Looking At
Metalworking
Resources
- Hackspace 2.5 Tasks (Google spreadsheet) - circa 2017
- Hackspace 2.5 (Trello) - jobs list