Hack the Space Days/8th-10th Feb 2019: Difference between revisions

From Nottinghack Wiki
Jump to navigation Jump to search
Spacebee (talk | contribs)
m -
No edit summary
 
(52 intermediate revisions by 7 users not shown)
Line 1: Line 1:
==Intro==
We held a Hack the Space weekend from 18:00 on Friday 8th February to 18:00 Sunday 10th February (some jobs starting at 13:00). It was all hands on deck improving our space! This wiki page was intended to detail exactly what needed doing so that we were all working towards the same goals. Now that the weekend is over, this page shows what we were working on and our progress.
We will be holding a Hack the Space weekend from 18:00 on Friday 8th February till 18:00 Sunday 10th February. '''During this time no normal project work will be happening.''' It'll be all hands on deck improving our space!  


Our Hackspace is only as great as our members make it so please join us. Regardless of if you can only spend 30 minutes or the whole weekend at the space; during this time any, and all, help will be greatly appreciated.  
Many thanks to the many people who gave their time to make this a success.  


This wiki page is interactive and is intended to detail exactly what needs doing so that we're all working towards the same goals. If you know of anything that needs fixing or looking at, feel free to add it to the list! In theory, someone could turn up at 3 am and complete some jobs off this list without anyone there to tell them what to do. You will see the page gradually change on the run-up to the weekend as more teams & members populate it.




== Studio Flooring Replacement ==
== Studio Flooring Replacement ==


As many are aware the studio flooring is in desperate need of replacement after many years of surviving. I think for 2019 it is time for new flooring. During this time we will also be resetting LPS (Large Project Storage). Below are some of the jobs if you are interested in helping out
As many are aware the studio flooring was in desperate need of replacement after many years of surviving. 2019 was time for new flooring. During this time we also reset LPS (Large Project Storage). Below are some of the jobs completed


{| class="wikitable"
{| class="wikitable"
Line 23: Line 21:
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Ongoing
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Ongoing
| style="font-family:Arial, Helvetica, sans-serif !important;;" | N/A
| style="font-family:Arial, Helvetica, sans-serif !important;;" | N/A
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Spacebee|Hairy Paul]]
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
|-
|-
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Replacement of Craft Room Floor
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Replacement of Craft Room Floor
| style="font-family:Arial, Helvetica, sans-serif !important;;" | 09/01/19 or 07/01/19
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
Session 1: 09/01/19 7pm.
 
Session 2: 15/01/19 7pm.
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri (daytime)
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri (daytime)
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Hairy Paul, anyone else?
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
[[User:Spacebee|Hairy Paul]], [[User:bobw|bobw]],
[[User:danspencer101|danspencer101]], HS2.5 Task force
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
Session 1: Carpet removed, Vinyl Cut.
Session 2: Hard Board and Vinyl Laid.
{{done|date=15/01/19}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Empty Large Project Storage
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Sewing Machines and Embroidery Machine
| style="font-family:Arial, Helvetica, sans-serif !important;;" | TBC
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Sewing Machines and Embrodery Machine
| style="font-family:Arial, Helvetica, sans-serif !important;;" | TBC
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Spacebee|Hairy Paul]]
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | The machines are now in the new craft room
 
{{done|date=29/01/19}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Tables & Chairs to Workshop
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Tables & Chairs to Workshop
Line 49: Line 54:
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/2019}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Daniel|Daniel]]
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/2019}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Remove Bench to workshop
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Remove Bench to workshop
Line 61: Line 66:
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/2019}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Removal of Workshop Floor
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Removal of Studio Floor
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri / Sat (Morn)
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri / Sat (Morn)
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat (AM)
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat (AM)
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/2019}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Prep floor for new flooring
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Prep floor for new flooring
Line 74: Line 79:
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
*Nails were hammered down.
*Worst parts of the Floor were filled in with new bits of wood.
*Stickiest parts of the floor had glue removed.
{{done|date=08/02/2019}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Lay new flooring
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Lay new flooring
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat / Sun
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat / Sun
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  {{done|date=09/02/2019}}
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | refix the door bars & make good.
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sun
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
Line 85: Line 101:
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines back
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines back
Line 91: Line 107:
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Tidy and Drinks
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Tidy and Drinks
Line 97: Line 113:
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}}
|}
|}


===Progress Pictures===
<gallery mode=packed-hover heights=250px>
File:HTSD 8th Feb 2019 - Studio Floor Removed.jpg|Old Studio Floor Removed
File:HTSD 8th Feb 2019 - Studio Floor Prepping.jpg|Prepping the Studio Floor
File:HTSD 8th Feb 2019 - Laying out Hardboard.jpg|Laying out Hardboard
File:HTSD 8th Feb 2019 - Laying Vinyl.jpg|Laying Vinyl
File:HTSD 8th Feb 2019 - Finished Studio Floor.jpeg|Finished Vinyl Floor
</gallery>


==Redesigning the Large Project Storage Area==
==Clearing the Large Project Storage Area==
 
[[File:HTSD 8th Feb 2019 - LPS Cleared.jpeg|200px|right|thumb|Large Project Storage used to be here!]]
{| class="wikitable"
{| class="wikitable"
! colspan="5" style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Studio Floor Replacement
! colspan="5" style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Large Project Storage
|-
|-
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Job
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Job
Line 112: Line 136:
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Completed?
| style="text-align: center; font-weight:bold; text-decoration:underline; font-family:Arial, Helvetica, sans-serif !important;;" | Completed?
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" | EXAMPLE 1 Empty the Craft Room
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Give notice of intentions to Hackspace members
| style="font-family:Arial, Helvetica, sans-serif !important;;" | EXAMPLE 2 Ongoing
| style="font-family:Arial, Helvetica, sans-serif !important;;" | 03/01/2019
| style="font-family:Arial, Helvetica, sans-serif !important;;" | EXAMPLE 3 N/A
| style="font-family:Arial, Helvetica, sans-serif !important;;" | -
| style="font-family:Arial, Helvetica, sans-serif !important;;" | EXAMPLE 4
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie
| style="font-family:Arial, Helvetica, sans-serif !important;;" | EXAMPLE 5
| style="font-family:Arial, Helvetica, sans-serif !important;;" | [https://groups.google.com/d/msg/nottinghack/NNtj3JX-9iI/8EKMJA5_DwAJ This] was sent out in addition to Posters put up in the space
|-
 
|-
{{done|date=03/01/19}}
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Empty the main shelves, auditing projects as we go
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/19}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Empty the temporary sheet storage, auditing projects as we go
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Clear all corners and under tables of abandoned crap
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/19}}
|-
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move all abandoned projects into the closed off area of 2.5
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Friday 8th, 1pm - 8pm
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sophie, Jymbob
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=08/02/19}}
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |  
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
|-
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
| style="font-family:Arial, Helvetica, sans-serif !important;;" |
|}
|}


The [[Large Project Storage]] has been cleared!


Thank you to all volunteers :)


"Active" projects have been moved to sheet storage over the weekend.
All others have been moved to downstairs for a month.
{{clear}}


==CNC Area==
==PAT Testing==
===Dust shoe for CNC Mill===
{{also|Team:Safety/Portable_appliance_testing}}
Portable appliance testing needs to be carried out to bring us in line with safety regulations. This job started on Saturday. It is simple to do and needs no special skills beyond being able to properly use and read the test equipment. Demonstrations were available from James Adams or [[User:Layjet|James Taylor]] of [[Team:Safety|Safety Team]] and [[Trustees|Trustee]] fame.
 
Portable Appliance Testing Records (credit [[User:Alexmann|Alex Mann]])
http://nhpat.ocatelle.xyz/login/
 
Contact: Team: Safety ([[Slack]]) - James Taylor
 
===See also===
* [http://www.hse.gov.uk/electricity/faq-portable-appliance-testing.htm PAT - Portable appliance testing FAQs (Health and Safety Executive)]
 
===Progress===
Many thanks to all those who participated in the PAT testing. Lots of appliances were tested and added to the relevant databases.
 
==Miscellaneous Jobs==
===Fire Escape Signage===
New fire escape signage has been hung around the hackspace.


This is a low priority task that could be worked on if alone in the space during the shutdown.
{{done|date=10/02/2019}}
It will probably require some 3D Modelling skill.


The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover.
===Electrics within the workshop===
Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html
Workshop lights were replaced


===Tool Storage Rack===
{{done|date=10/02/2019}}


The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. Don't think any modelling skills will be required for this as there are lots of different solutions that could work.
===Washing the Lab Coats===
Lab coats and overalls were taken home and given a good wash.  
Sparkly white now & fit for human habitation.  


<gallery>
File:HTSD 10th Feb 2019 - Washing Labcoats.jpeg|Filthy Labcoats
File:HTSD 10th Feb 2019 - Clean Labcoats.jpeg|Clean Labcoats
</gallery>


{{done|date=10/02/2019}}


===Move the Piano===
The [[Piano]] was moved into the comfy area. The radiogram has not been moved.


==Miscellaneous Jobs==
{{done|date=10/02/2019}}
*Reorganise comfy area including rewiring of speakers
*Electrics within the workshop (replacing lights) etc
*2.5 jobs TBC


===Broken Toilet Seat===
===Broken Toilet Seat===
One of the toilet seats is broken and could do with being replaced.
[[File:HTSD - Broken toilet seat.jpeg|150px|thumbnail|right|Broken lid]]
 
One of the toilet seats was broken.


I will try to add a picture here that may help with finding a replacement
There is a new shiny lid on the toilet now as this has been completed by some anonymous kind soul


===Producing a Checklist of tools and PAT testing===
{{done|date=24/01/19}}
Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend. There is already a wiki page for this list that can be updated by anyone :)
{{clear}}
 
===Leaking Tap===
The hot tap in the upstairs toilet is leaking. This could do with being looked at before it gets any worse by someone with plumbing skills.
 
See Video:
 
{{#widget:YouTube|id=qjY11-KQwho}}
 
===Producing a Checklist of tools===
 
Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend, (see also Portable Appliance Testing Records at http://nhpat.ocatelle.xyz/login/). There is already a wiki page for this list that can be updated by anyone :)


The wiki page for the list is located here: [[Tools/We_Have|Tool list]]
The wiki page for the list is located here: [[Tools/We_Have|Tool list]]


[[Category:Events]]
==CNC Area==
[[File:HTSD - Loose CNC tools needing a rack.jpeg|150px|thumbnail|right|Loose tools sitting on the stepper controller]]
===Dust shoe for CNC Mill===
 
This is a low priority task that could be worked on if alone in the space during the shutdown.
It will probably require some 3D Modelling skill.
 
The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover.
Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html
 
===Tool Storage Rack===
See: [[Project:CNC Tool Storage]]
 
The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future.
{{clear}}
[[Category:Events (past)]]

Latest revision as of 18:45, 8 May 2019

We held a Hack the Space weekend from 18:00 on Friday 8th February to 18:00 Sunday 10th February (some jobs starting at 13:00). It was all hands on deck improving our space! This wiki page was intended to detail exactly what needed doing so that we were all working towards the same goals. Now that the weekend is over, this page shows what we were working on and our progress.

Many thanks to the many people who gave their time to make this a success.


Studio Flooring Replacement

As many are aware the studio flooring was in desperate need of replacement after many years of surviving. 2019 was time for new flooring. During this time we also reset LPS (Large Project Storage). Below are some of the jobs completed

Studio Floor Replacement
Job Day Deadline Volunteers Completed?
Empty the Craft Room Ongoing N/A Hairy Paul
Replacement of Craft Room Floor

Session 1: 09/01/19 7pm.

Session 2: 15/01/19 7pm.

Fri (daytime)

Hairy Paul, bobw,

danspencer101, HS2.5 Task force

Session 1: Carpet removed, Vinyl Cut.

Session 2: Hard Board and Vinyl Laid.

 Done (15/01/19)

Move Sewing Machines and Embroidery Machine Fri Hairy Paul The machines are now in the new craft room

 Done (29/01/19)

Move Tables & Chairs to Workshop Fri Fri  Done (08/02/2019)
Move Vending Machines Fri Fri Daniel  Done (08/02/2019)
Remove Bench to workshop Fri Fri  Done (08/02/2019)
Removal of Studio Floor Fri / Sat (Morn) Sat (AM)  Done (08/02/2019)
Prep floor for new flooring Sat Sat (PM)
  • Nails were hammered down.
  • Worst parts of the Floor were filled in with new bits of wood.
  • Stickiest parts of the floor had glue removed.

 Done (08/02/2019)

Lay new flooring Sat / Sun  Done (09/02/2019)
refix the door bars & make good. Sun
Move Tables & Chairs back to workshop Sun  Done (10/02/2019)
Move Vending Machines back Sun  Done (10/02/2019)
Tidy and Drinks Sun  Done (10/02/2019)

Progress Pictures

Clearing the Large Project Storage Area

Large Project Storage used to be here!
Large Project Storage
Job Day Deadline Volunteers Completed?
Give notice of intentions to Hackspace members 03/01/2019 - Sophie This was sent out in addition to Posters put up in the space

 Done (03/01/19)

Empty the main shelves, auditing projects as we go Friday 8th, 1pm - 8pm Friday 8th, 1pm - 8pm Sophie, Jymbob  Done (08/02/19)
Empty the temporary sheet storage, auditing projects as we go Friday 8th, 1pm - 8pm Friday 8th, 1pm - 8pm Sophie, Jymbob
Clear all corners and under tables of abandoned crap Friday 8th, 1pm - 8pm Friday 8th, 1pm - 8pm Sophie, Jymbob  Done (08/02/19)
Move all abandoned projects into the closed off area of 2.5 Friday 8th, 1pm - 8pm Friday 8th, 1pm - 8pm Sophie, Jymbob  Done (08/02/19)

The Large Project Storage has been cleared!

Thank you to all volunteers :)

"Active" projects have been moved to sheet storage over the weekend. All others have been moved to downstairs for a month.

PAT Testing

Portable appliance testing needs to be carried out to bring us in line with safety regulations. This job started on Saturday. It is simple to do and needs no special skills beyond being able to properly use and read the test equipment. Demonstrations were available from James Adams or James Taylor of Safety Team and Trustee fame.

Portable Appliance Testing Records (credit Alex Mann) http://nhpat.ocatelle.xyz/login/

Contact: Team: Safety (Slack) - James Taylor

See also

Progress

Many thanks to all those who participated in the PAT testing. Lots of appliances were tested and added to the relevant databases.

Miscellaneous Jobs

Fire Escape Signage

New fire escape signage has been hung around the hackspace.

 Done (10/02/2019)

Electrics within the workshop

Workshop lights were replaced

 Done (10/02/2019)

Washing the Lab Coats

Lab coats and overalls were taken home and given a good wash. Sparkly white now & fit for human habitation.

 Done (10/02/2019)

Move the Piano

The Piano was moved into the comfy area. The radiogram has not been moved.

 Done (10/02/2019)

Broken Toilet Seat

Broken lid

One of the toilet seats was broken.

There is a new shiny lid on the toilet now as this has been completed by some anonymous kind soul

 Done (24/01/19)

Leaking Tap

The hot tap in the upstairs toilet is leaking. This could do with being looked at before it gets any worse by someone with plumbing skills.

See Video:

Producing a Checklist of tools

Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend, (see also Portable Appliance Testing Records at http://nhpat.ocatelle.xyz/login/). There is already a wiki page for this list that can be updated by anyone :)

The wiki page for the list is located here: Tool list

CNC Area

Loose tools sitting on the stepper controller

Dust shoe for CNC Mill

This is a low priority task that could be worked on if alone in the space during the shutdown. It will probably require some 3D Modelling skill.

The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover. Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html

Tool Storage Rack

See: Project:CNC Tool Storage

The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future.