Hack the Space Days/8th-10th Feb 2019: Difference between revisions
No edit summary |
|||
(18 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
We held a Hack the Space weekend from 18:00 on Friday 8th February to 18:00 Sunday 10th February (some jobs starting at 13:00). It was all hands on deck improving our space! This wiki page was intended to detail exactly what needed doing so that we were all working towards the same goals. Now that the weekend is over, this page shows what we were working on and our progress. | |||
We | |||
Many thanks to the many people who gave their time to make this a success. | |||
== Studio Flooring Replacement == | == Studio Flooring Replacement == | ||
As many are aware the studio flooring | As many are aware the studio flooring was in desperate need of replacement after many years of surviving. 2019 was time for new flooring. During this time we also reset LPS (Large Project Storage). Below are some of the jobs completed | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 22: | Line 21: | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Ongoing | | style="font-family:Arial, Helvetica, sans-serif !important;;" | Ongoing | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | N/A | | style="font-family:Arial, Helvetica, sans-serif !important;;" | N/A | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Spacebee|Hairy Paul]] | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
|- | |- | ||
Line 43: | Line 42: | ||
{{done|date=15/01/19}} | {{done|date=15/01/19}} | ||
|- | |- | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Sewing Machines and | | style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Sewing Machines and Embroidery Machine | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri | | style="font-family:Arial, Helvetica, sans-serif !important;;" | Fri | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | [[User:Spacebee|Hairy Paul]] | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | The machines are now in the new craft room | | style="font-family:Arial, Helvetica, sans-serif !important;;" | The machines are now in the new craft room | ||
Line 80: | Line 79: | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
* | *Nails were hammered down. | ||
*Worst parts of the Floor were filled in with new bits of wood. | *Worst parts of the Floor were filled in with new bits of wood. | ||
*Stickiest parts of the floor had glue removed. | *Stickiest parts of the floor had glue removed. | ||
Line 88: | Line 87: | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Lay new flooring | | style="font-family:Arial, Helvetica, sans-serif !important;;" | Lay new flooring | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat / Sun | | style="font-family:Arial, Helvetica, sans-serif !important;;" | Sat / Sun | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | |||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | |||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=09/02/2019}} | |||
|- | |||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | refix the door bars & make good. | |||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Sun | |||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
Line 96: | Line 101: | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}} | ||
|- | |- | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines back | | style="font-family:Arial, Helvetica, sans-serif !important;;" | Move Vending Machines back | ||
Line 102: | Line 107: | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}} | ||
|- | |- | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | Tidy and Drinks | | style="font-family:Arial, Helvetica, sans-serif !important;;" | Tidy and Drinks | ||
Line 108: | Line 113: | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | | ||
| style="font-family:Arial, Helvetica, sans-serif !important;;" | | | style="font-family:Arial, Helvetica, sans-serif !important;;" | {{done|date=10/02/2019}} | ||
|} | |} | ||
Line 116: | Line 121: | ||
File:HTSD 8th Feb 2019 - Studio Floor Prepping.jpg|Prepping the Studio Floor | File:HTSD 8th Feb 2019 - Studio Floor Prepping.jpg|Prepping the Studio Floor | ||
File:HTSD 8th Feb 2019 - Laying out Hardboard.jpg|Laying out Hardboard | File:HTSD 8th Feb 2019 - Laying out Hardboard.jpg|Laying out Hardboard | ||
File:HTSD 8th Feb 2019 - Laying Vinyl.jpg|Laying Vinyl | |||
File:HTSD 8th Feb 2019 - Finished Studio Floor.jpeg|Finished Vinyl Floor | |||
</gallery> | </gallery> | ||
Line 171: | Line 178: | ||
{{clear}} | {{clear}} | ||
== | ==PAT Testing== | ||
[[ | {{also|Team:Safety/Portable_appliance_testing}} | ||
Portable appliance testing needs to be carried out to bring us in line with safety regulations. This job started on Saturday. It is simple to do and needs no special skills beyond being able to properly use and read the test equipment. Demonstrations were available from James Adams or [[User:Layjet|James Taylor]] of [[Team:Safety|Safety Team]] and [[Trustees|Trustee]] fame. | |||
Portable Appliance Testing Records (credit [[User:Alexmann|Alex Mann]]) | |||
http://nhpat.ocatelle.xyz/login/ | |||
Contact: Team: Safety ([[Slack]]) - James Taylor | |||
=== | ===See also=== | ||
* [http://www.hse.gov.uk/electricity/faq-portable-appliance-testing.htm PAT - Portable appliance testing FAQs (Health and Safety Executive)] | |||
===Progress=== | |||
Many thanks to all those who participated in the PAT testing. Lots of appliances were tested and added to the relevant databases. | |||
==Miscellaneous Jobs== | ==Miscellaneous Jobs== | ||
===Fire Escape Signage=== | |||
New fire escape signage has been hung around the hackspace. | |||
{{done|date=10/02/2019}} | |||
===Electrics within the workshop=== | |||
Workshop lights were replaced | |||
{{done|date=10/02/2019}} | |||
===Washing the Lab Coats=== | |||
Lab coats and overalls were taken home and given a good wash. | |||
Sparkly white now & fit for human habitation. | |||
<gallery> | |||
File:HTSD 10th Feb 2019 - Washing Labcoats.jpeg|Filthy Labcoats | |||
File:HTSD 10th Feb 2019 - Clean Labcoats.jpeg|Clean Labcoats | |||
</gallery> | |||
{{done|date=10/02/2019}} | |||
===Move the Piano=== | ===Move the Piano=== | ||
The [[Piano]] was moved into the comfy area. The radiogram has not been moved. | |||
{{done|date=10/02/2019}} | |||
===Broken Toilet Seat=== | ===Broken Toilet Seat=== | ||
[[File:HTSD - Broken toilet seat.jpeg|150px|thumbnail|right|Broken lid]] | [[File:HTSD - Broken toilet seat.jpeg|150px|thumbnail|right|Broken lid]] | ||
One of the toilet seats | One of the toilet seats was broken. | ||
There is a new shiny lid on the toilet now as this has been completed by some anonymous kind soul | There is a new shiny lid on the toilet now as this has been completed by some anonymous kind soul | ||
Line 207: | Line 230: | ||
{{clear}} | {{clear}} | ||
=== | ===Leaking Tap=== | ||
The hot tap in the upstairs toilet is leaking. This could do with being looked at before it gets any worse by someone with plumbing skills. | |||
See Video: | |||
{{#widget:YouTube|id=qjY11-KQwho}} | |||
===Producing a Checklist of tools=== | |||
Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend, (see also Portable Appliance Testing Records at http://nhpat.ocatelle.xyz/login/). There is already a wiki page for this list that can be updated by anyone :) | |||
The wiki page for the list is located here: [[Tools/We_Have|Tool list]] | |||
==CNC Area== | |||
[[File:HTSD - Loose CNC tools needing a rack.jpeg|150px|thumbnail|right|Loose tools sitting on the stepper controller]] | |||
===Dust shoe for CNC Mill=== | |||
This is a low priority task that could be worked on if alone in the space during the shutdown. | |||
It will probably require some 3D Modelling skill. | |||
The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover. | |||
Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html | |||
===Tool Storage Rack=== | |||
See: [[Project:CNC Tool Storage]] | |||
[[Category:Events]] | The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future. | ||
{{clear}} | |||
[[Category:Events (past)]] |
Latest revision as of 18:45, 8 May 2019
We held a Hack the Space weekend from 18:00 on Friday 8th February to 18:00 Sunday 10th February (some jobs starting at 13:00). It was all hands on deck improving our space! This wiki page was intended to detail exactly what needed doing so that we were all working towards the same goals. Now that the weekend is over, this page shows what we were working on and our progress.
Many thanks to the many people who gave their time to make this a success.
Studio Flooring Replacement
As many are aware the studio flooring was in desperate need of replacement after many years of surviving. 2019 was time for new flooring. During this time we also reset LPS (Large Project Storage). Below are some of the jobs completed
Studio Floor Replacement | ||||
---|---|---|---|---|
Job | Day | Deadline | Volunteers | Completed? |
Empty the Craft Room | Ongoing | N/A | Hairy Paul | |
Replacement of Craft Room Floor |
Session 1: 09/01/19 7pm. Session 2: 15/01/19 7pm. |
Fri (daytime) |
danspencer101, HS2.5 Task force |
Session 1: Carpet removed, Vinyl Cut. Session 2: Hard Board and Vinyl Laid. Done (15/01/19) |
Move Sewing Machines and Embroidery Machine | Fri | Hairy Paul | The machines are now in the new craft room
Done (29/01/19) | |
Move Tables & Chairs to Workshop | Fri | Fri | Done (08/02/2019) | |
Move Vending Machines | Fri | Fri | Daniel | Done (08/02/2019) |
Remove Bench to workshop | Fri | Fri | Done (08/02/2019) | |
Removal of Studio Floor | Fri / Sat (Morn) | Sat (AM) | Done (08/02/2019) | |
Prep floor for new flooring | Sat | Sat (PM) |
Done (08/02/2019) | |
Lay new flooring | Sat / Sun | Done (09/02/2019) | ||
refix the door bars & make good. | Sun | |||
Move Tables & Chairs back to workshop | Sun | Done (10/02/2019) | ||
Move Vending Machines back | Sun | Done (10/02/2019) | ||
Tidy and Drinks | Sun | Done (10/02/2019) |
Progress Pictures
-
Old Studio Floor Removed
-
Prepping the Studio Floor
-
Laying out Hardboard
-
Laying Vinyl
-
Finished Vinyl Floor
Clearing the Large Project Storage Area
Large Project Storage | ||||
---|---|---|---|---|
Job | Day | Deadline | Volunteers | Completed? |
Give notice of intentions to Hackspace members | 03/01/2019 | - | Sophie | This was sent out in addition to Posters put up in the space
Done (03/01/19) |
Empty the main shelves, auditing projects as we go | Friday 8th, 1pm - 8pm | Friday 8th, 1pm - 8pm | Sophie, Jymbob | Done (08/02/19) |
Empty the temporary sheet storage, auditing projects as we go | Friday 8th, 1pm - 8pm | Friday 8th, 1pm - 8pm | Sophie, Jymbob | |
Clear all corners and under tables of abandoned crap | Friday 8th, 1pm - 8pm | Friday 8th, 1pm - 8pm | Sophie, Jymbob | Done (08/02/19) |
Move all abandoned projects into the closed off area of 2.5 | Friday 8th, 1pm - 8pm | Friday 8th, 1pm - 8pm | Sophie, Jymbob | Done (08/02/19) |
The Large Project Storage has been cleared!
Thank you to all volunteers :)
"Active" projects have been moved to sheet storage over the weekend. All others have been moved to downstairs for a month.
PAT Testing
- See also: Team:Safety/Portable_appliance_testing
Portable appliance testing needs to be carried out to bring us in line with safety regulations. This job started on Saturday. It is simple to do and needs no special skills beyond being able to properly use and read the test equipment. Demonstrations were available from James Adams or James Taylor of Safety Team and Trustee fame.
Portable Appliance Testing Records (credit Alex Mann) http://nhpat.ocatelle.xyz/login/
Contact: Team: Safety (Slack) - James Taylor
See also
Progress
Many thanks to all those who participated in the PAT testing. Lots of appliances were tested and added to the relevant databases.
Miscellaneous Jobs
Fire Escape Signage
New fire escape signage has been hung around the hackspace.
Done (10/02/2019)
Electrics within the workshop
Workshop lights were replaced
Done (10/02/2019)
Washing the Lab Coats
Lab coats and overalls were taken home and given a good wash. Sparkly white now & fit for human habitation.
-
Filthy Labcoats
-
Clean Labcoats
Done (10/02/2019)
Move the Piano
The Piano was moved into the comfy area. The radiogram has not been moved.
Done (10/02/2019)
Broken Toilet Seat
One of the toilet seats was broken.
There is a new shiny lid on the toilet now as this has been completed by some anonymous kind soul
Done (24/01/19)
Leaking Tap
The hot tap in the upstairs toilet is leaking. This could do with being looked at before it gets any worse by someone with plumbing skills.
See Video:
Producing a Checklist of tools
Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend, (see also Portable Appliance Testing Records at http://nhpat.ocatelle.xyz/login/). There is already a wiki page for this list that can be updated by anyone :)
The wiki page for the list is located here: Tool list
CNC Area
Dust shoe for CNC Mill
This is a low priority task that could be worked on if alone in the space during the shutdown. It will probably require some 3D Modelling skill.
The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover. Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html
Tool Storage Rack
The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future.