Infrastructure store: Difference between revisions
mNo edit summary |
m linky |
||
(10 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{archive|date=February 2019}} | |||
Should NOT be a staging post between the 'space and scrap / disposal except by special arrangement (e.g. the existing wood lathe may go in here) | The space no longer has this unit. All the contents are now in the [[Team Storage]]. | ||
{{grey-start}} | |||
{{Location | |||
|image= | |||
|team= | |||
|use=Storage of infrastructure materials. | |||
|floor=Downstairs | |||
|parentlocation= | |||
|floorplanimage= | |||
|past=yes | |||
}} | |||
==What is it? Where is it? == | |||
As of the start of June 2014, we have been allowed to use, for a very small monthly fee, a totally unreconstructed toilet on the ground floor of Bizspace Roden street. | |||
This is ''not'' a place where we can store projects or raw materials - it is cold, draughty and damp - but we have decided to use is as a store for Infrastructure Materials. | |||
The benefit of this is that there should be less confusion about what otherwise unidentified things are hackable, and what are being accumulated for infrastructure projects. We can also park things that only get used at certain times of year - gas heaters / lighting for EMF camp, etc. Excess storage items (multi-drawer cabinets, bookcase kits, etc.) are also included as it is inconceivable that these will ''never'' be used, though we lack room in the current Hackspace. | |||
== How we should use this facility == | |||
Should NOT be a staging post between the 'space and scrap / disposal except by special arrangement (e.g. the existing wood lathe may go in here before disposal) | |||
Should NOT remove items from general use - i.e. some ''but not all'' of the trollies will be stored here. | |||
* Catalogue everything that goes in. Later we can run off some labels to identify "Hackspace Infrastructure Store" items. | * Catalogue everything that goes in. Later we can run off some labels to identify "Hackspace Infrastructure Store" items. | ||
Line 7: | Line 32: | ||
* Items to move in quickly | * Items to move in quickly | ||
** Woolworths trolley-cage and contents (sort / catalogue later) | ** Woolworths trolley-cage and contents (sort / catalogue later ?) | ||
** Stacking plastic chairs | ** Stacking plastic chairs | ||
** Air Cylinder ( | ** Air Cylinder + Fridge Compressors (for centralised compressed-air infrastructure project / RussellH) | ||
** IKEA Billy bookcase (main parts - find and add hardware later) | ** IKEA Billy bookcase (main parts - find and add hardware later) | ||
Line 20: | Line 45: | ||
** Ducting tubes and fittings, Vacuum cleaner hose tub. | ** Ducting tubes and fittings, Vacuum cleaner hose tub. | ||
** Vinyl flooring material | |||
** Studding timber and Plywood for bench building | |||
** Dexion angle / spur shelving uprights, spur brackets etc. | ** Dexion angle / spur shelving uprights, spur brackets etc. | ||
Line 67: | Line 96: | ||
** Top of spray booth - could suit some lightweight project storage? | ** Top of spray booth - could suit some lightweight project storage? | ||
** Under bench in | ** Under bench in metalwork area (will become filled with more relevant items very soon!) | ||
** Quite a bit of floorspace (especially end of Myford area) All 'free space needs marking as such - for project | ** Quite a bit of floorspace (especially end of Myford area) All 'free space needs marking as such - for project construction (NOT STORAGE) use (Need to get floor-marking tape) | ||
== Items In Store == | == Items In Store == | ||
Plastic stacking chairs (spatter-painted) | Notice to users: Please update this list whenever items are added or removed. Once the store has had it's initial fill, a hard-copy should be available in the space, to that people know what has ''vanished'' there. | ||
Plastic stacking chairs (spatter-painted) in wheeled cage. N.B. the stack is very high, safe while in the cage, but unstable otherwise. If chairs are needed, they should be removed one at a time from the top of the pile until not rising above the top of the cage. | |||
Air Conditioning unit (Heats / Cools / Dries - ideal for use in the studio over winter) | Air Conditioning unit (Heats / Cools / Dries - ideal for use in the studio over winter) | ||
Large centrifugal fan | Large centrifugal fan + 3phase 1.1HP motor for above - dusty area dust management project. | ||
Large red air cylinder - Russell's compressed air infrastructure project. | |||
2 Red gas cylinders - one full, one empty. | |||
Cabbage tray containing long 3phase extension cable. | |||
Cabbage tray containing heavy electrical switchgear ex. distribution cabinet. SCRAP? | |||
Red tub containing 100mm ducting joints / couplings / bends. | |||
4 red fire extinguisher cases + mounting hardware. Possible use for welding rod storage, or may be needed for an outside extinguisher in Hackspace 3.0 otherwise SCRAP? | |||
4 Maplin multi-drawer cabinets (more to be added). Other similar, but not-the-same, cabinets are still in the 'space, and may be sold on or distributed to other hackspaces? | |||
{{grey-end}} |
Latest revision as of 09:52, 27 April 2019
The information on this page is NOT current. It retained for historical or archival purposes only. (February 2019) |
The space no longer has this unit. All the contents are now in the Team Storage.
What is it? Where is it?As of the start of June 2014, we have been allowed to use, for a very small monthly fee, a totally unreconstructed toilet on the ground floor of Bizspace Roden street. This is not a place where we can store projects or raw materials - it is cold, draughty and damp - but we have decided to use is as a store for Infrastructure Materials. The benefit of this is that there should be less confusion about what otherwise unidentified things are hackable, and what are being accumulated for infrastructure projects. We can also park things that only get used at certain times of year - gas heaters / lighting for EMF camp, etc. Excess storage items (multi-drawer cabinets, bookcase kits, etc.) are also included as it is inconceivable that these will never be used, though we lack room in the current Hackspace. How we should use this facilityShould NOT be a staging post between the 'space and scrap / disposal except by special arrangement (e.g. the existing wood lathe may go in here before disposal) Should NOT remove items from general use - i.e. some but not all of the trollies will be stored here.
Items In StoreNotice to users: Please update this list whenever items are added or removed. Once the store has had it's initial fill, a hard-copy should be available in the space, to that people know what has vanished there. Plastic stacking chairs (spatter-painted) in wheeled cage. N.B. the stack is very high, safe while in the cage, but unstable otherwise. If chairs are needed, they should be removed one at a time from the top of the pile until not rising above the top of the cage. Air Conditioning unit (Heats / Cools / Dries - ideal for use in the studio over winter) Large centrifugal fan + 3phase 1.1HP motor for above - dusty area dust management project. Large red air cylinder - Russell's compressed air infrastructure project. 2 Red gas cylinders - one full, one empty. Cabbage tray containing long 3phase extension cable. Cabbage tray containing heavy electrical switchgear ex. distribution cabinet. SCRAP? Red tub containing 100mm ducting joints / couplings / bends. 4 red fire extinguisher cases + mounting hardware. Possible use for welding rod storage, or may be needed for an outside extinguisher in Hackspace 3.0 otherwise SCRAP? 4 Maplin multi-drawer cabinets (more to be added). Other similar, but not-the-same, cabinets are still in the 'space, and may be sold on or distributed to other hackspaces? |