Hack the Space Days/8th-10th Feb 2019: Difference between revisions
Line 210: | Line 210: | ||
The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future. | The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future. | ||
{{clear}} | {{clear}} | ||
==Miscellaneous Jobs== | |||
===Fire Escape Signage=== | |||
New fire escape signage has been hung around the hackspace. | |||
{{done|date=10/02/2019}} | |||
===Electrics within the workshop=== | |||
Workshop lights were replaced | |||
{{done|date=10/02/2019}} | |||
===Washing the Lab Coats=== | |||
Lab coats and overalls were taken home and given a good wash. | |||
Sparkly white now & fit for human habitation. | |||
= | {{done|date=10/02/2019}} | ||
===Move the Piano=== | ===Move the Piano=== | ||
The [[Piano]] was moved into the comfy area. The radiogram has not been moved. | |||
{{done|date=10/02/2019}} | |||
{{done}} | |||
===Broken Toilet Seat=== | ===Broken Toilet Seat=== | ||
Line 237: | Line 247: | ||
{{#widget:YouTube|id=qjY11-KQwho}} | {{#widget:YouTube|id=qjY11-KQwho}} | ||
[[Category:Events]] | [[Category:Events]] |
Revision as of 16:37, 11 February 2019
We held a Hack the Space weekend from 18:00 on Friday 8th February till 18:00 Sunday 10th February (some jobs starting at 13:00). It's all hands on deck improving our space!
Many thanks to the many people who gave their time to make this a success.
This wiki page is interactive and is intended to detail exactly what needs doing so that we're all working towards the same goals. If you know of anything that needs fixing or looking at, feel free to add it to the list! In theory, someone could turn up at 3 am and complete some jobs off this list without anyone there to tell them what to do. You will see the page gradually change as the weekend progresses as more teams & members populate it.
Studio Flooring Replacement
As many are aware the studio flooring was in desperate need of replacement after many years of surviving. 2019 was time for new flooring. During this time we also reset LPS (Large Project Storage). Below are some of the jobs completed
Studio Floor Replacement | ||||
---|---|---|---|---|
Job | Day | Deadline | Volunteers | Completed? |
Empty the Craft Room | Ongoing | N/A | Hairy Paul | |
Replacement of Craft Room Floor |
Session 1: 09/01/19 7pm. Session 2: 15/01/19 7pm. |
Fri (daytime) |
danspencer101, HS2.5 Task force |
Session 1: Carpet removed, Vinyl Cut. Session 2: Hard Board and Vinyl Laid. Done (15/01/19) |
Move Sewing Machines and Embroidery Machine | Fri | Hairy Paul | The machines are now in the new craft room
Done (29/01/19) | |
Move Tables & Chairs to Workshop | Fri | Fri | Done (08/02/2019) | |
Move Vending Machines | Fri | Fri | Daniel | Done (08/02/2019) |
Remove Bench to workshop | Fri | Fri | Done (08/02/2019) | |
Removal of Studio Floor | Fri / Sat (Morn) | Sat (AM) | Done (08/02/2019) | |
Prep floor for new flooring | Sat | Sat (PM) |
Done (08/02/2019) | |
Lay new flooring | Sat / Sun | Done (09/02/2019) | ||
refix the door bars & make good. | Sun | |||
Move Tables & Chairs back to workshop | Sun | Done (10/02/2019) | ||
Move Vending Machines back | Sun | Done (10/02/2019) | ||
Tidy and Drinks | Sun | Done (10/02/2019) |
Progress Pictures
-
Old Studio Floor Removed
-
Prepping the Studio Floor
-
Laying out Hardboard
-
Laying Vinyl
Clearing the Large Project Storage Area
Large Project Storage | ||||
---|---|---|---|---|
Job | Day | Deadline | Volunteers | Completed? |
Give notice of intentions to Hackspace members | 03/01/2019 | - | Sophie | This was sent out in addition to Posters put up in the space
Done (03/01/19) |
Empty the main shelves, auditing projects as we go | Friday 8th, 1pm - 8pm | Friday 8th, 1pm - 8pm | Sophie, Jymbob | Done (08/02/19) |
Empty the temporary sheet storage, auditing projects as we go | Friday 8th, 1pm - 8pm | Friday 8th, 1pm - 8pm | Sophie, Jymbob | |
Clear all corners and under tables of abandoned crap | Friday 8th, 1pm - 8pm | Friday 8th, 1pm - 8pm | Sophie, Jymbob | Done (08/02/19) |
Move all abandoned projects into the closed off area of 2.5 | Friday 8th, 1pm - 8pm | Friday 8th, 1pm - 8pm | Sophie, Jymbob | Done (08/02/19) |
The Large Project Storage has been cleared!
Thank you to all volunteers :)
"Active" projects have been moved to sheet storage over the weekend. All others have been moved to downstairs for a month.
PAT Testing
- See also: Team:Safety/Portable_appliance_testing
Portable appliance testing needs to be carried out to bring us in line with safety regulations. This job started on Saturday. It is simple to do and needs no special skills beyond being able to properly use and read the test equipment. Demonstrations were available from James Adams or James Taylor of Safety Team and Trustee fame.
Portable Appliance Testing Records (credit Alex Mann) http://nhpat.ocatelle.xyz/login/
Contact: Team: Safety (Slack) - James Taylor
See also
Producing a Checklist of tools
Producing a list of tools is a task that can be worked on if you find yourself alone or you are working on PAT testing during the weekend, (see also Portable Appliance Testing Records at http://nhpat.ocatelle.xyz/login/). There is already a wiki page for this list that can be updated by anyone :)
The wiki page for the list is located here: Tool list
CNC Area
Dust shoe for CNC Mill
This is a low priority task that could be worked on if alone in the space during the shutdown. It will probably require some 3D Modelling skill.
The mill could potentially be fitted with a removable dust shoe that has an attachment for the hoover. Something that looks something like this: http://www.cncrouterparts.com/universal-cnc-dust-shoe-p-396.html
Tool Storage Rack
The collets and tools are currently sitting loose on the stepper controller under the CNC PC monitor. I would like to get some kind of tool rack made to better organise the area. The rack should include provision space for more tools to be added in the future.
Miscellaneous Jobs
Fire Escape Signage
New fire escape signage has been hung around the hackspace.
Done (10/02/2019)
Electrics within the workshop
Workshop lights were replaced
Done (10/02/2019)
Washing the Lab Coats
Lab coats and overalls were taken home and given a good wash. Sparkly white now & fit for human habitation.
Done (10/02/2019)
Move the Piano
The Piano was moved into the comfy area. The radiogram has not been moved. Done (10/02/2019)
Broken Toilet Seat
One of the toilet seats was broken.
There is a new shiny lid on the toilet now as this has been completed by some anonymous kind soul
Done (24/01/19)
Leaking Tap
The hot tap in the upstairs toilet is leaking. This could do with being looked at before it gets any worse by someone with plumbing skills.
See Video: