| Breakfast at 10:30am in the Hackspace [[Kitchen]]
| Breakfast from 10:00 in the Hackspace [[Kitchen]]
A couple of helpers are welcome - add your name to the volunteer column :)
A couple of helpers are welcome - add your name to the volunteer column :)
No charge, small donations welcome. This is mostly as a thanks for coming.
No charge, small donations welcome. This is mostly as a thanks for coming.
| [[Kitchen]]
| [[Kitchen]]
| <s>Aaron</s>
| <s>Aaron</s> Shane
|  
| {{done}}
|-
|-
| General Tidying
| General Tidying
|  
|  
|  
|  
|  
| {{done}}
|-
|-
| Replace battery in [[Workshop]] temp/humidity sensor.
| Replace battery in [[Workshop]] temp/humidity sensor.
| [[Workshop]]
| [[Workshop]]
|  
|  
|  
| {{done}}
|-
|-
| Sort through large project storage
| Sort through large project storage
Line 39: Line 39:
| [[Dusty Area]]
| [[Dusty Area]]
|  
|  
|  
| {{done}}
|-
|-
| Empty all the bins
| Empty all the bins
Line 49: Line 49:
|  
|  
|  
|  
|
| {{done}}
|-
|-
| Mount the Electronics Area LED Matrix Display to the wall somehow.  
| Mount the Electronics Area LED Matrix Display to the wall somehow.  
Line 64: Line 64:
| [[Blue Room]]
| [[Blue Room]]
|
|
|
| {{done}}
|-
|-
| Check vending machine item dates
| Check vending machine item dates
| [[Studio]]
| [[Studio]]
| [[Team:Snackspace|Snackspace Team]]
| [[Team:Snackspace|Snackspace Team]]
|
| {{done}}
|-
|-
| Install the flip dot display in the Comfy Area
| Install the flip dot display in the Comfy Area
| [[Comfy Area]]
| [[Comfy Area]]
| Aaron
| Aaron
|
| {{done}}
|-
|-
| Replace 3of9 temporary switch with a more permanent 48 port switch. Probably not done during the day unless feeling brave.
| Replace 3of9 temporary switch with a more permanent 48 port switch. Probably not done during the day unless feeling brave.
| [[Members Storage]]
| [[Members Storage]]
| [[Team:Network and Servers|Network Team]]
| [[Team:Network and Servers|Network Team]]
|
| {{done}}
|-
|-
| Clean around the CNC router - lots of plastic
| Clean around the CNC router - lots of plastic
Line 94: Line 94:
| [[Electronics Area]]
| [[Electronics Area]]
|
|
|
| {{done}}
|-
|-
| Check the chairs in the Studio. Some of them are falling apart. Fix them if they are broken, or declare them beyond repair if that's the case. We have lots of plastic black chairs. Maybe we should switch to them at some point. Less cosy though.
| Check the chairs in the Studio. Some of them are falling apart. Fix them if they are broken, or declare them beyond repair if that's the case. We have lots of plastic black chairs. Maybe we should switch to them at some point. Less cosy though.
Line 104: Line 104:
| [[Comfy Area]]
| [[Comfy Area]]
| Everyone
| Everyone
|
| {{done}}
|-
|-
| Sweep and vacuum the metalworking area
| Sweep and vacuum the metalworking area
| [[Metalworking Area]]
| [[Metalworking Area]]
|
|
|
| {{done}}
|-
|-
| Sort through random piles of components and put them in their correct place
| Sort through random piles of components and put them in their correct place
Line 116: Line 116:
|
|
|-
|-
| Clear space in downstairs metalworking to make room for something - ask AJ, I can't remember what we said in the members meeting.
| Clear red floor area as much as able in downstairs metalworking. Bonus: Try to make space for warco to move to final resting place. Air compressor and tank move to the cubby between metalworking + eventual toilet.  
| [[Metalworking Downstairs]]
| [[Metalworking Downstairs]]
|
|
Line 130: Line 130:
|
|
|-
|-
| Check posters and remove the ones which are for things that happened in the past
| Check posters and replace with more relevant posters, if there are any.
| Everywhere
| Everywhere
|
|

Latest revision as of 09:00, 10 November 2025

There will be a Hack the Space Day on Saturday 4th October 2025. It's all hands on deck improving our space! This wiki page is intended to detail exactly what needs doing so that we were all working towards the same goals. See 10th August 2025 for what we got up to last time (lots!)!

Many thanks to the people giving their time to make this a success.

You're welcome to start working on these tasks at any time, if you can't make the day. Every little helps.

Tasks

Task Area Volunteers Completed?
Breakfast from 10:00 in the Hackspace Kitchen

A couple of helpers are welcome - add your name to the volunteer column :) No charge, small donations welcome. This is mostly as a thanks for coming.

Kitchen Aaron Shane  Done 
General Tidying  Done 
Replace battery in Workshop temp/humidity sensor. Workshop  Done 
Sort through large project storage Studio Trustees
Vacuum dusty area Dusty Area  Done 
Empty all the bins
PAT Testing - and labelling assets. As part of the fire risk assessment outcomes.  Done 
Mount the Electronics Area LED Matrix Display to the wall somehow. Electronics Area
Build a stand / rail thing to stop the many leaflets in the Airlock from falling off the window sill. Airlock
Mushroom inspection Blue Room  Done 
Check vending machine item dates Studio Snackspace Team  Done 
Install the flip dot display in the Comfy Area Comfy Area Aaron  Done 
Replace 3of9 temporary switch with a more permanent 48 port switch. Probably not done during the day unless feeling brave. Members Storage Network Team  Done 
Clean around the CNC router - lots of plastic Workshop
Audit members boxes Members Storage & Members Storage Downstairs Trustees
Tidy Electronics Area benches and clean any flux residue Electronics Area  Done 
Check the chairs in the Studio. Some of them are falling apart. Fix them if they are broken, or declare them beyond repair if that's the case. We have lots of plastic black chairs. Maybe we should switch to them at some point. Less cosy though. Studio
Admire the Neon Sign Comfy Area Everyone  Done 
Sweep and vacuum the metalworking area Metalworking Area  Done 
Sort through random piles of components and put them in their correct place Electronics Area
Clear red floor area as much as able in downstairs metalworking. Bonus: Try to make space for warco to move to final resting place. Air compressor and tank move to the cubby between metalworking + eventual toilet. Metalworking Downstairs
Continue to organise team storage a bit more Team Storage
Make some QR codes for commonly misused tools (e.g. band saw) pointing to a video about how to use one correctly. Everywhere
Check posters and replace with more relevant posters, if there are any. Everywhere

Progress pictures