| Aaron | | Aaron | ||
| | | {{Done}} | ||
|- | |- | ||
| General Tidying | | General Tidying | ||
| Line 28: | Line 28: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Vacuum [[Comfy Area]] | | Vacuum [[Comfy Area]] | ||
| Line 34: | Line 34: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Give [[Studio]] Floor a clean | | Give [[Studio]] Floor a clean | ||
| Line 40: | Line 40: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| The usual clear out of the [[Laser Area]] | | The usual clear out of the [[Laser Area]] | ||
| Line 46: | Line 46: | ||
| | | | ||
| Any and all welcome | | Any and all welcome | ||
| | | {{Done}} | ||
|- | |- | ||
| Re-mount screwdriver holders to centre bench | | Re-mount screwdriver holders to centre bench | ||
| Line 52: | Line 52: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Fix the [[Kitchen]] cutlery drawer again | | Fix the [[Kitchen]] cutlery drawer again | ||
| Line 58: | Line 58: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Sort through large project storage | | Sort through large project storage | ||
| Line 70: | Line 70: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Vacuum [[Dusty Area]] | | Vacuum [[Dusty Area]] | ||
| Line 76: | Line 76: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Check [[Dusty Area]] extraction to ensure it's not spewing dust into the air | | Check [[Dusty Area]] extraction to ensure it's not spewing dust into the air | ||
| Line 83: | Line 83: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Continue to organise team storage a bit more | | Continue to organise team storage a bit more | ||
| Line 101: | Line 101: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Empty all the bins | | Empty all the bins | ||
| Line 107: | Line 107: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Put up spare solvents cabinet in [[Electronics Area]] - Ask Aaron for more info! | | Put up spare solvents cabinet in [[Electronics Area]] - Ask Aaron for more info! | ||
| Line 113: | Line 113: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Build a new mailbox for the door, replacing metal one. The metal one has no key and needs too much dexterity to extract mail. Probably doesn't need to lock. | | Build a new mailbox for the door, replacing metal one. The metal one has no key and needs too much dexterity to extract mail. Probably doesn't need to lock. | ||
| Line 119: | Line 119: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Make some QR codes for commonly misused tools (e.g. band saw) pointing to a video about how to use one correctly. | | Make some QR codes for commonly misused tools (e.g. band saw) pointing to a video about how to use one correctly. | ||
| Line 131: | Line 131: | ||
| | | | ||
| [[Team:Infrastructure|Infrastructure]] / [[Team:Network and Servers|Network]] | | [[Team:Infrastructure|Infrastructure]] / [[Team:Network and Servers|Network]] | ||
| | | {{Done}} | ||
|- | |- | ||
| Build a rail thing for storing SMT reels under the reflow oven bench in [[Electronics Area]] | | Build a rail thing for storing SMT reels under the reflow oven bench in [[Electronics Area]] | ||
| Line 155: | Line 155: | ||
| | | | ||
| Aaron | | Aaron | ||
| | | {{Done}} | ||
|- | |- | ||
| PAT Testing | | PAT Testing | ||
| Line 161: | Line 161: | ||
| | | | ||
| Someone that knows what they're doing | | Someone that knows what they're doing | ||
| | | {{Done}} Partial | ||
|- | |- | ||
| Make a box for the duck helper badges | | Make a box for the duck helper badges | ||
| Line 167: | Line 167: | ||
| | | | ||
| Emily | | Emily | ||
| | | {{Done}} | ||
|- | |- | ||
| Check the bandsaw in team storage | | Check the bandsaw in team storage | ||
| Line 173: | Line 173: | ||
| | | | ||
| Woodworking | | Woodworking | ||
| | | {{Done}} | ||
|- | |- | ||
| Sharpen wood lathe tools. (Might already be okay. Shane was playing with some and found them ineffective - could be a skill issue!) | | Sharpen wood lathe tools. (Might already be okay. Shane was playing with some and found them ineffective - could be a skill issue!) | ||
| Line 179: | Line 179: | ||
| | | | ||
| Woodworking / Metalworking | | Woodworking / Metalworking | ||
| | | {{Done}} | ||
|- | |- | ||
| Make a list of PPE signage in each area (and optionally identify what might be missing) - Please email to trustees | | Make a list of PPE signage in each area (and optionally identify what might be missing) - Please email to trustees | ||
| Line 197: | Line 197: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Tidy [[Comfy Area AV]] and check things haven't been rewired. | | Tidy [[Comfy Area AV]] and check things haven't been rewired. | ||
| Line 203: | Line 203: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|- | |- | ||
| Redo LED and sign-off/induct button wiring on Bridgeport [[Nhtools]] | | Redo LED and sign-off/induct button wiring on Bridgeport [[Nhtools]] | ||
| Line 215: | Line 215: | ||
| | | | ||
| | | | ||
| | | {{Done}} | ||
|} | |} | ||
Revision as of 21:14, 7 June 2025
There will be a Hack the Space Day on Saturday the 7th June 2025. It's all hands on deck improving our space! This wiki page is intended to detail exactly what needs doing so that we were all working towards the same goals. See 9th March 2025 for what we got up to last time!
Many thanks to the people giving their time to make this a success.
You're welcome to start working on these tasks at any time, if you can't make the day. Every little helps.
Tasks
| Big task one | ||||
|---|---|---|---|---|
| Sub-task | When | Deadline | Volunteers | Completed? |
| Breakfast at 10am in the Hackspace Kitchen
A couple of helpers are welcome - add your name to the volunteer column :) No charge, small donations welcome. This is mostly as a thanks for coming. |
Aaron | |||
| General Tidying | ||||
| Vacuum Comfy Area | ||||
| Give Studio Floor a clean | ||||
| The usual clear out of the Laser Area | Any and all welcome | |||
| Re-mount screwdriver holders to centre bench | ||||
| Fix the Kitchen cutlery drawer again | ||||
| Sort through large project storage | Trustees only | |||
| Get one of the donated Mac Pros setup somewhere | ||||
| Vacuum Dusty Area | ||||
| Check Dusty Area extraction to ensure it's not spewing dust into the air
(this may explain some of the small particle dust on the floor) |
||||
| Continue to organise team storage a bit more | ||||
| Audit hand tools in workshop and make sure they are working fine, suggest replacements where necessary. | ||||
| Clean around CNC Area | ||||
| Empty all the bins | ||||
| Put up spare solvents cabinet in Electronics Area - Ask Aaron for more info! | ||||
| Build a new mailbox for the door, replacing metal one. The metal one has no key and needs too much dexterity to extract mail. Probably doesn't need to lock. | ||||
| Make some QR codes for commonly misused tools (e.g. band saw) pointing to a video about how to use one correctly. | ||||
| Replace the RFID reader going into Members Storage Downstairs | Infrastructure / Network | |||
| Build a rail thing for storing SMT reels under the reflow oven bench in Electronics Area | Electronics Team and others! | |||
| Build a test lead comb for hanging test leads on the wall (rather than keeping them in a horrible box) | Electronics Team and others! | |||
| Build / laser cut a new glove box holder for workshop | Anyone! | |||
| Add ds18b20 temperature sensor to Laser Cutter chiller via Laser Display. | Aaron | |||
| PAT Testing | Someone that knows what they're doing | |||
| Make a box for the duck helper badges | Emily | |||
| Check the bandsaw in team storage | Woodworking | |||
| Sharpen wood lathe tools. (Might already be okay. Shane was playing with some and found them ineffective - could be a skill issue!) | Woodworking / Metalworking | |||
| Make a list of PPE signage in each area (and optionally identify what might be missing) - Please email to trustees | ||||
| Find some drawers which aren't labelled and label them! | ||||
| Tidy Electronics Area benches and floor | ||||
| Tidy Comfy Area AV and check things haven't been rewired. | ||||
| Redo LED and sign-off/induct button wiring on Bridgeport Nhtools | Aaron / Network Team | |||
| Check on the Space's Posters | ||||