Related changes
Jump to navigation
Jump to search
Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
28 March 2025
|
N 23:30 | Team:Electronics/Risk Assessments/Hot Air Rework 2 changes history +2,231 [Asj (2×)] | |||
m |
|
23:30 (cur | prev) −2 Asj talk contribs (Correct risk assessment name) | |||
N |
|
22:57 (cur | prev) +2,233 Asj talk contribs (Created page with "{{RiskAssessment |name = Reflow Soldering |assessmentType = Activity |reviewed = 2025-03-28 |nextReview = 2026-03-28 |notes = Hot air rework involves using a temperature controlled hot air gun to lift or resolder surface mount components. |risk_1 = '''Minor Burns''' due to coming into contact with a heated board or the end of the hot air nozzle. |mitigation_1 = The hot air rework station has a cradle for securely holding the "gun"...") |
|
22:10 | Template:Tool 4 changes history +390 [Asj (4×)] | |||
|
22:10 (cur | prev) +13 Asj talk contribs | ||||
m |
|
21:59 (cur | prev) +24 Asj talk contribs | |||
m |
|
21:57 (cur | prev) +1 Asj talk contribs (Correct missing risk assessment category) | |||
|
21:56 (cur | prev) +352 Asj talk contribs (Add optional link to risk assessment) |