Drying Area: Difference between revisions
grey |
This small area off the Studio was converted into the Screen Printing Area in July 2019. |
||
Line 1: | Line 1: | ||
{{archive|reason=Converted into the [[Screen Printing Area]]|date=July 2019}} | {{archive|reason=Converted into the [[Screen Printing Area]]|date=July 2019}} | ||
This small area off the [[Studio]] was converted into the [[Screen Printing Area]] in July 2019. | |||
{{grey-start}} | {{grey-start}} | ||
{{Location | {{Location |
Latest revision as of 08:00, 12 July 2019
The information on this page is NOT current. It retained for historical or archival purposes only. (July 2019) |
This small area off the Studio was converted into the Screen Printing Area in July 2019.
Note: This use case for the area is being operated as a trial. It was conceived at the 2019-03-06 Members Meeting.
This area was replaced with the Screen Printing Area July 2019. Tools and equipmentNo Tools are stored in this area.
Important notesProjects being left in this area still require Do Not Hack labels generated in the same way as for Large Project Storage. If you cannot place the label on the thing that is drying, please place it in an obvious spot immediately next to the project. This is not an area to store things permanently. AvailabilityThis area does not require booking and can not be booked. Cleaning and maintenanceAlways leave the area as you would like to find it. Build time into your schedule for cleaning up. The cleaning equipment is Toilets. Problems and issuesIf there is a problem in the Drying Area contact the Craft & Textiles Team. |
Locations | |
---|---|
Upstairs | Comfy Area • Studio • Members Storage • Textiles Workshop • Kitchen • Toilets • Workshop • Dusty Area • Metalworking Area • Spray Booth • Laser Area • CNC Area • Screen Printing |
Downstairs | 3D Printer Area • Electronics Area • Blue Room • Team Storage • Metalworking Downstairs • Members Storage Downstairs • Classroom • Bike Area • Main Corridor • CNC Corridor |