Hackspace 2.5: Difference between revisions

From Nottinghack Wiki
Jump to navigation Jump to search
Tasos (talk | contribs)
No edit summary
Jymbob (talk | contribs)
No edit summary
 
(50 intermediate revisions by 3 users not shown)
Line 1: Line 1:
Following the nearly unanamous vote at the AGM on 2015-12-03, Hackspace 2.5 is going to happen!
{{Location
|image=File:LogoOrig-upscale.svg
|team=
|use=More Hacking, More Making & More Being
|floor=
|floorplanimage=File:Floorplan - Hackspace2point0.png
}}
{{also|Hackspace 2.0|l1=Hackspace 2.0 (upstairs)|The Space|Getting to the space|Access to the space}}
Hackspace 2.5 is the new '''downstairs''' section of our space. It is a [[/Project|work in progress]] but has partly opened up for general use. Currently [[Electronics Area|Electronics]], [[3D Printer Area|3D Printing]] and the [[Blue Room]] are fully opened.


We will rent additional units on the ground floor of Roden House, beneith our current location.  Below are 4 images - outline plans of our current space and the new units, and a potential way we could use this space - this is purely for illustrative purposes and is likely to change a lot!
You will find the main route to Hackspace 2.5 is sign posted from the back door of the [[Hackspace 2.0]] [[Metalworking Area]]. It's also possible to access this area from the street level doors on Roden Street at the north side of the building.


The space will allow us to increase the size of most of our most used spaces, and will give us room for bigger, better, tools. We will be able to put stairs and disabled access throughout the space, and move our “front door” to ground, step free, level.  A space downstairs could become a bigger “blue room”/classroom, which we could make into a bookable resource.  The large space downstairs has some concrete flooring, which could change what tools we can use.  In short, there are huge opportunities!
== Floor plan ==
{{Hackspace2.5_Map}}


It doesn’t tick all the boxes - there is no outside space and it doesn’t fix our parking issues, but it would be a massive improvement on what we have now.
{{note|Floor Plans are stored on the Nottinghack [https://github.com/NottingHack/rodenhouse/tree/master/exports github page.]}}
{{note|Some area names may be out of date on the floor plan}}


== What is the money for ==
==Work in progress, help out==
This is an incomplete list of capital expenditure items with ESTIMATES of the cost for each:
[[File:PaintersAtWork.jpg|thumb|220px|Painters at work (September-October 2016)]]
{| class="wikitable"
Work on Hackspace 2.5 started after a decision to proceed with the project at the AGM on 2015-12-03. A dedicated team of members have been working on the space every Tuesday evening since we got the keys to the unit.  
|-
! Item
! Estimated cost
|-
| Deposit || £4850
|-
| Lighting || £2400
|-
| Electrics (normal) || £1200
|-
| Electrics (3 phase) || £500
|-
| Internal staircase || £1500
|-
| Roller shutter || £1200
|-
| Double front doors || £1500
|-
| Access ramp || £1000
|-
| Windows (may be able to get bizspace to cover) || ?
|-
| Window bars || £500
|-
| Toilet rework (metal area) || £500
|-
| Toilet rework (cnc area) || £500
|-
| Internal double doors (storage to laser) || £100
|-
| Internal double doors (laser to cnc) || £100
|-
| Internal double doors (metal to members storage) || £100
|-
| Wifi AP's || £112.04
|-
| Network switches || £50
|-
| Network cat5 (cable, sockets, backbox) || £200
|-
| Infrastructure automations bits (RFID etc) || £200
|-
| Desks 8 of (blue room and others) || £600
|-
| Blue room chairs || £200
|-
| Members box shelving (wood build) || £200
|-
| Storage shelving (metal brought) || £624
|-
| Paint  ||  £50
|}


=== List of pledges ===
If you would like to help out, ask on the [https://nottinghack.slack.com/messages/C0CUF4H8V/ 2.5 Slack channel]. Some 2.5 jobs are listed on the [[ToDo|Trello]] and [[/ToDo|2.5 ToDo page]]. Other ways to help Nottinghack are on the [[Volunteering]] page.
Moved [[Project:Hackspace_2.5/Fundraising#Pledge_Drive|here]]


== Images ==
Some of the progress is documented on the [[/Project|Project]] page.
{{clear}}


[[File:Hackspace-2.0-plan.png|thumb|512px|none|Current space]]
===Hackspace 2.5 Trello===
[[File:Hackspace2.5 Plan.png|thumb|512px|none|New space]]
[[Trello]] is used for outstanding tasks, see [https://trello.com/b/wIdeNz1e/hackspace-25 Hackspace 2.5 Trello page].


[[File:Hackspace2.5 - Upstairs zoned.png|thumb|512px|none|Current space, zoned]]
Trello is a project management system, where you can create lists, add tasks to the lists, and then move tasks as they are completed. For those who have worked with Agile projects, it works in a similar way to a Kanban board. See [[ToDo]] for more information.
[[File:Hackspace2.5 - Downstairs zoned.png|thumb|512px|none|New space, zoned]]


== Photos ==
The Hackspace 2.5 Trello tasks:
Photos of the space prior to the cleaning day on 12/12/2015:
{{#widget:Iframe|url=https://trello.com/b/wIdeNz1e/hackspace-25|width=100%|height=750|border=0}}
{{#widget:Flickr|photoset=72157661618136359}}


Photos during/after the cleaning day:
==Fundraising==
{{#widget:Flickr|photoset=72157661740142040}}
There is a [[Tools#Pledge_Drives|pledge drive]] to raise funds for 2.5, see [[/Fundraising|Fundraising]].
 
Photos from building racking units in G4 (Infrastructure Storage), December 2016:
<gallery mode=packed-hover heights=180px>
File:RacksBuild.jpg
File:RacksInstall.jpg
File:RacksDonejpg
</gallery>


== Full Sub Page List ==
== Full Sub Page List ==


{{Special:PrefixIndex/{{FULLPAGENAME}}/ |stripprefix=1}}
{{Special:PrefixIndex/{{FULLPAGENAME}}/ |stripprefix=1}}
[[Category:Pledge Drives]]
 
[[Category:Projects]]
==Resources==
* [https://nottinghack.slack.com/messages/C0CUF4H8V/ 2.5 Slack channel]
* [https://www.flickr.com/photos/nottinghack/sets/72157677745615373 Photos of Hackspace 2.5 7th March 2017 work day (flickr)]
 
<br />
{{Location List}}
 
[[Category:Featured]]
[[Category:Maps and plans]]
[[Category:Infrastructure]]
[[Category:Location]]
[[Category:About]]
[[Category:Looking for Collaborators]]

Latest revision as of 10:03, 18 December 2023

Hackspace 2.5
Intended Use More Hacking, More Making & More Being
Manufacturer {{{manufacturer}}}
Model {{{model}}}
Team Infrastructure
Floor
Area [[{{{parentlocation}}}]]
Map
Locations:   all pages                 {{}}

Hackspace 2.5 is the new downstairs section of our space. It is a work in progress but has partly opened up for general use. Currently Electronics, 3D Printing and the Blue Room are fully opened.

You will find the main route to Hackspace 2.5 is sign posted from the back door of the Hackspace 2.0 Metalworking Area. It's also possible to access this area from the street level doors on Roden Street at the north side of the building.

Floor plan

Note Note: Floor Plans are stored on the Nottinghack github page.
Note Note: Some area names may be out of date on the floor plan

Work in progress, help out

Painters at work (September-October 2016)

Work on Hackspace 2.5 started after a decision to proceed with the project at the AGM on 2015-12-03. A dedicated team of members have been working on the space every Tuesday evening since we got the keys to the unit.

If you would like to help out, ask on the 2.5 Slack channel. Some 2.5 jobs are listed on the Trello and 2.5 ToDo page. Other ways to help Nottinghack are on the Volunteering page.

Some of the progress is documented on the Project page.

Hackspace 2.5 Trello

Trello is used for outstanding tasks, see Hackspace 2.5 Trello page.

Trello is a project management system, where you can create lists, add tasks to the lists, and then move tasks as they are completed. For those who have worked with Agile projects, it works in a similar way to a Kanban board. See ToDo for more information.

The Hackspace 2.5 Trello tasks:

Fundraising

There is a pledge drive to raise funds for 2.5, see Fundraising.

Full Sub Page List

Resources


Locations
Upstairs Comfy AreaStudioMembers StorageTextiles WorkshopKitchenToiletsWorkshopDusty AreaMetalworking AreaSpray BoothLaser AreaCNC AreaScreen Printing
Downstairs 3D Printer AreaElectronics AreaBlue RoomTeam StorageMetalworking DownstairsMembers Storage DownstairsClassroomBike AreaMain CorridorCNC Corridor
Changes in [[:Category:]]
No changes during the given period match these criteria.