Hackspace 2.5: Difference between revisions

From Nottinghack Wiki
Jump to navigation Jump to search
No edit summary
Jymbob (talk | contribs)
No edit summary
 
(82 intermediate revisions by 23 users not shown)
Line 1: Line 1:
Hackspace 2.5 could be closer than we think!
{{Location
|image=File:LogoOrig-upscale.svg
|team=
|use=More Hacking, More Making & More Being
|floor=
|floorplanimage=File:Floorplan - Hackspace2point0.png
}}
{{also|Hackspace 2.0|l1=Hackspace 2.0 (upstairs)|The Space|Getting to the space|Access to the space}}
Hackspace 2.5 is the new '''downstairs''' section of our space. It is a [[/Project|work in progress]] but has partly opened up for general use. Currently [[Electronics Area|Electronics]], [[3D Printer Area|3D Printing]] and the [[Blue Room]] are fully opened.


We have an opportunity to take on additional space downstairs. Below are 4 images - outline plans of our current space and the new space downstairs, and a potential way we could use this space - this is purely for illustrative purposes and is likely to change a lot if we actually take it on!
You will find the main route to Hackspace 2.5 is sign posted from the back door of the [[Hackspace 2.0]] [[Metalworking Area]]. It's also possible to access this area from the street level doors on Roden Street at the north side of the building.


The space would allow us to increase the size of most of our most used spaces, and will give us space for bigger, better, tools.  We would be able to put stairs and disabled access throughout the space, and move our “front door” to ground, step free, level.  A space downstairs could become a bigger “blue room”/classroom, which we could make into a bookable resource.  The large space downstairs has some concrete flooring, which could change what tools we can use.  In short, there are huge opportunities.
== Floor plan ==
{{Hackspace2.5_Map}}


It doesn’t tick all the boxes - there is no outside space and it doesn’t fix our parking issues, but it would be a massive improvement on what we have now.
{{note|Floor Plans are stored on the Nottinghack [https://github.com/NottingHack/rodenhouse/tree/master/exports github page.]}}
{{note|Some area names may be out of date on the floor plan}}


In true Hackspace fashion, we’d like to start a pledge drive to go towards capital costs, deposit and possibly even increase our buffer to prevent us from going into the red.
==Work in progress, help out==
[[File:PaintersAtWork.jpg|thumb|220px|Painters at work (September-October 2016)]]
Work on Hackspace 2.5 started after a decision to proceed with the project at the AGM on 2015-12-03. A dedicated team of members have been working on the space every Tuesday evening since we got the keys to the unit.  


== What is the money for ==
If you would like to help out, ask on the [https://nottinghack.slack.com/messages/C0CUF4H8V/ 2.5 Slack channel]. Some 2.5 jobs are listed on the [[ToDo|Trello]] and [[/ToDo|2.5 ToDo page]]. Other ways to help Nottinghack are on the [[Volunteering]] page.


Without full plans it is hard to say, but it will likely go towards one or more of the following:
Some of the progress is documented on the [[/Project|Project]] page.
{{clear}}


* New electrics, Lighting throughout, sockets - including 3 phase
===Hackspace 2.5 Trello===
* Stairs
[[Trello]] is used for outstanding tasks, see [https://trello.com/b/wIdeNz1e/hackspace-25 Hackspace 2.5 Trello page].
* New Entrance with Ramp
* Decorating
* Floor
* Kitting out the rooms with desk/chairs/shelves/etc


== Pledge Drive ==
Trello is a project management system, where you can create lists, add tasks to the lists, and then move tasks as they are completed. For those who have worked with Agile projects, it works in a similar way to a Kanban board. See [[ToDo]] for more information.


Unlike other pledge drives, we are flexible on when we will collect this. There is no date we need to hit to get it in.  We would like people to pay within a couple of months of the end of the pledge, which will be when we take possession but we have enough money in the current buffer to cover any costs.  Your pledge would then "refill" the buffer.
The Hackspace 2.5 Trello tasks:
{{#widget:Iframe|url=https://trello.com/b/wIdeNz1e/hackspace-25|width=100%|height=750|border=0}}


=== Rewards ===
==Fundraising==
There is a [[Tools#Pledge_Drives|pledge drive]] to raise funds for 2.5, see [[/Fundraising|Fundraising]].


In keeping with tradition, we will have a new "Wall of Names" showing who helped make the new space possible
== Full Sub Page List ==


Additionally, we will be the biggest Hackspace in the UK
{{Special:PrefixIndex/{{FULLPAGENAME}}/ |stripprefix=1}}


=== List of pledges ===
==Resources==
* [https://nottinghack.slack.com/messages/C0CUF4H8V/ 2.5 Slack channel]
* [https://www.flickr.com/photos/nottinghack/sets/72157677745615373 Photos of Hackspace 2.5 7th March 2017 work day (flickr)]


'''DO NOT''' send any money yet!
<br />
{{Location List}}


{| class="wikitable"
[[Category:Featured]]
|-
[[Category:Maps and plans]]
! Who
[[Category:Infrastructure]]
! How Much
[[Category:Location]]
! Paid?
[[Category:About]]
! Method Paid
[[Category:Looking for Collaborators]]
|-
| [[User:James|James Hayward]] || £200 || No ||
|-
| [[User:Lwk|'RepRap' Matt]] || £100 || No ||
|-
| [[User:Moodybass|John Moody]] || £200 || No ||
|-
| [[User:Msemtd|Michael]] || £100 || No ||
|-
| [[User:Elsen|Soph]] & [[User:Mrwonka|Adam]] || £200 || No ||
|-
| [[User:Freekyboyal|Alex W]] & [[User:Kirkichi|Kirsty]] || £200 || No ||
|-
| Anonymous Member || £200 || No ||
|-
| [[User:Robert|Rob Hunt]] || £125 || No ||
|-
| [[User:Chunky|Matt Little]] || £100 || No ||
|-
|}
 
{{#widget:PledgeTracker}}
 
== Images ==
 
[[File:Hackspace-2.0-plan.png|thumb|512px|none|Current space]]
[[File:Hackspace2.5 Plan.png|thumb|512px|none|New space]]
 
[[File:Hackspace2.5 - Upstairs zoned.png|thumb|512px|none|Current space, zoned]]
[[File:Hackspace2.5 - Downstairs zoned.png|thumb|512px|none|New space, zoned]]
 
[[Category:Pledge Drives]]

Latest revision as of 10:03, 18 December 2023

Hackspace 2.5
Intended Use More Hacking, More Making & More Being
Manufacturer {{{manufacturer}}}
Model {{{model}}}
Team Infrastructure
Floor
Area [[{{{parentlocation}}}]]
Map
Locations:   all pages                 {{}}

Hackspace 2.5 is the new downstairs section of our space. It is a work in progress but has partly opened up for general use. Currently Electronics, 3D Printing and the Blue Room are fully opened.

You will find the main route to Hackspace 2.5 is sign posted from the back door of the Hackspace 2.0 Metalworking Area. It's also possible to access this area from the street level doors on Roden Street at the north side of the building.

Floor plan

Note Note: Floor Plans are stored on the Nottinghack github page.
Note Note: Some area names may be out of date on the floor plan

Work in progress, help out

Painters at work (September-October 2016)

Work on Hackspace 2.5 started after a decision to proceed with the project at the AGM on 2015-12-03. A dedicated team of members have been working on the space every Tuesday evening since we got the keys to the unit.

If you would like to help out, ask on the 2.5 Slack channel. Some 2.5 jobs are listed on the Trello and 2.5 ToDo page. Other ways to help Nottinghack are on the Volunteering page.

Some of the progress is documented on the Project page.

Hackspace 2.5 Trello

Trello is used for outstanding tasks, see Hackspace 2.5 Trello page.

Trello is a project management system, where you can create lists, add tasks to the lists, and then move tasks as they are completed. For those who have worked with Agile projects, it works in a similar way to a Kanban board. See ToDo for more information.

The Hackspace 2.5 Trello tasks:

Fundraising

There is a pledge drive to raise funds for 2.5, see Fundraising.

Full Sub Page List

Resources


Locations
Upstairs Comfy AreaStudioMembers StorageTextiles WorkshopKitchenToiletsWorkshopDusty AreaMetalworking AreaSpray BoothLaser AreaCNC AreaScreen Printing
Downstairs 3D Printer AreaElectronics AreaBlue RoomTeam StorageMetalworking DownstairsMembers Storage DownstairsClassroomBike AreaMain CorridorCNC Corridor
Changes in [[:Category:]]
No changes during the given period match these criteria.